Funded projects

Explore a list of all projects which have been approved for funding through the CITB Flexible and Structured funds. Projects categorised by fund and window, and then by funding option within each window. Click on a window to explore further.  


Flexible funding 

Structured funding 

Window total 

Window 1

16

£1.52m

4

£5.82m

20

£7.34m

Window 2

56

£2.21m

2

£3m

59

£5.22m

Window 3

72

£1.02m

   

72

£1.02m

Window 4

139

£1.35m

8

£2.53m

147

£3.88m

Window 5

222 £1.27m 1 £0.16m

223

£1.43m

Funding total

505

£7.37m

15

£11.51m

520

£18.88m

Download a summary of approved projects in Welsh (PDF, 181KB)

Web design by S8080