The candidate will be able to
| Additional guidance to support learning outcome |
Describe shingle system features including:
- shingle types, uses, and materials
- fasteners and fixing methods
- resistance to wind uplift and rain penetration
- shakes
- decorative shingles
- intrusions/soil pipe
- inclined valleys
- vertical surfaces
- maintenance
- ridges
- hip shingles
|
Manufacturer’s:
- brochure
- installation information
Samples of:
- shingles
- shakes
- fittings
- fasteners
- fixings
- ridges
- flashing
- inclined valleys
|
Describe types, materials, and purpose, and features of
- fittings: eave support trays
- abutments: top edge, side edge
- inclined valleys: sheet metal, preformed valleys, mitred
- flashings and junctions
|
Interpret instructions and drawings
|
Examples of:
- manufacturer’s instructions
- roofing drawings
- requirements/specifications
- architects drawings
|
Use tools and equipment (hand and power) for:
- measuring, marking, cutting, and installing
- types, uses, cleaning, setting, hazards, maintenance, and storage
|
Examples of tools and equipment
Examples of manufacture’s operating and maintenance manuals (O&M)
|
Perform estimates for materials:
- shingles, battens, and membrane
|
Sample estimates
|
Perform calculations for batten spacings including:
|
Sample calculations
|
Make and use gauging and marking stick
|
Examples of gauging and marking stick
|
Calculate side and head lap for shingles
|
Sample calculations
|
Describe how to store and handle roofing materials including:
- on open ground
- in a covered building
- on the roof
|
|
Describe how to lift materials onto the roof by:
- hand, winch, conveyor, hoist
|
Videos of methods
|
Plan the work including:
- access, start point, exit, set out, foot traffic, communication, materials, equipment, other trades
|
Access methods to/from the roof depend on availability, roof type, a risk assessment, plus working at height PPE, and may include:
- step ladders, platform ladders, leaning ladders, trestles, elevated work platforms, scissor lifts, cherry pickers, boom lifts, travel towers, guard rails, mobile scaffold, and fixed scaffold
|
Work safely including:
- follow safe work practices/procedures
- identify hazards
- reduce/eliminate risks
- use controls
- use personal protective equipment (PPE)
|
Videos/photos of good and bad practice.
Examples of:
- PPE
- risk assessments
- safe work practices/procedures
- spills and clean up
- environmental legislation
- safety legislation
- SDS sheets for COSHH
|
Roof check including:
- defects, slope angle, spacings, dimensions, squareness and compensation techniques
|
Video in classroom
Practical demonstration in workshop using a roof rig
Candidate practice with coaching using a roof rig
|
Set out including:
- safe manual handling methods
- safe places to put materials on the structure
|
Install the breather membrane including:
- eaves support trays and ventilation if required
|
Install battens
|
Install shingles including:
- ridge, valley, hip, verge, main roof area, and abutment
|
Mark and cut shingles using hand and power tools
|
Install flashings and /or lead soakers
|
Maintain a clean and tidy workplace
|
|
Describe what to do if the weather deteriorates including:
- hot, cold, windy, and wet
- before, during, and after the work
|
|
Clean up and dispose of waste materials
|
Environmental considerations for waste materials
|