Module |
Subject |
Duration |
M1 |
Induction |
|
1.1 |
General Housekeeping |
0.25hrs |
1.2 |
New Entrant Scheme Registration and N/SVQ induction, Employment Rights and Responsibilities |
2.5hrs |
1.3 |
Issue workbooks / Portfolio Building / Assessments |
0.25hrs |
1.4 |
Introduction to CSCS |
0.25hrs |
M2 |
Health & Safety |
|
2.1 |
Legislation |
0.5hrs |
2.2 |
Health & Safety at Work |
1hr |
2.3 |
Accidents in the work place |
1hr |
2.4 |
General hazards on site |
1hr |
2.5 |
Working at Heights |
1hr |
2.6 |
Working in Confined Spaces |
1 hr |
2.7 |
Fire Prevention |
0.5hr |
2.8 |
Personal Protective Equipment |
1hr |
2.9 |
Asbestos Awareness |
1 day |
2.1 |
First Aid |
1 day |
M3 |
Preliminaries & Sector Knowledge |
|
3.1 |
Background to Structural Waterproofing – PCA I day Technicians Course |
1 day |
3.2 |
Documentation, Drawings, Risk Assessments and Method Statements (RAMS) |
½ day |
3.3 |
Site Compliance |
1 hour |
3.4 |
Site Delivery Checks |
0.5 hour |
3.5 |
Site off Load and Storage |
0.5 hour |
3.6 |
Manual Handling |
1 hour |
3.7 |
Protection of Materials and Tools |
1 hour |
3.8 |
Installing, constructing and maintaining work area protection and Safety Equipment |
1 day |
3.9 |
Operate powered units, tools or pedestrian plant, machinery or equipment |
½ day |
3.1 |
Inspect and complete user maintenance on plant and machinery |
½ day |
3.11 |
Small Tools |
½ day |
3.12 |
Set out secondary dimensional work control |
½ day |
M4 |
Practical & Knowledge On Site |
|
4.1 |
Prepare surfaces for (all forms of) structural waterproofing |
1 day |
4.2 |
Prepare joints in structures including ‘dry-pack’ underpinned areas and apply primary waterproofing |
1 day |
4.3 |
Apply cementitious coatings, multi-coat renders, crystallisation active materials with/without primers |
2 days |
4.4 |
Apply liquid, multi-pack, resin & Mastic Asphalt systems with/without primers |
1.5 days |
4.5 |
Install sheet membrane systems with/without primers |
1.5 days |
4.6 |
Install cavity drainage membrane systems |
2 days |
4.7 |
Install drains, sumps and pumping ancillaries |
2 days |
4.8 |
Prepare and Install gas membranes |
1 day |
4.9 |
Prepare for and apply concrete |
2 days |
4.1 |
Dismantling and removing temporary work area protection and safety equipment |
1 day |
4.11 |
Final Testing and sign off |
1 day |
|
TOTAL DAYS |
24 |