Facebook Pixel
Skip to content

Installation of linear joint and cavity barriers (open state and full fill) seals refresher

We have doubled the grant rates for short course tiers 1 – 3. To address rising costs, you can now receive higher rates on course achievements from 1st April 2023

Grant Tier

Achievement date before 1 April 2023

Achievement date on or after 1 April 2023

Grant Tier 1

Grant Tier 1 Refresher

£30

£15

£60

£30

Grant Tier 2

Grant Tier 2 Refresher

£70

£35

£140

£70

Grant Tier 3

Grant Tier 3 Refresher

£120

£60

£240

£120

Overview

The purpose of Installation of linear joint and cavity barriers (open state and full fill) seals refresher course is for delegates who have previously passed the Installation of linear joint and cavity barriers (open state and full fill) seals course or subsequent refresher course and can provide proof of attendance.

Duration

1 day of 6 learning hours. If e-learning only, the duration is to be at least 50% of this. 

Purpose/scope

The purpose of Installation of linear joint and cavity barriers (open state and full fill) seals refresher course is for delegates who have previously passed the Installation of linear joint and cavity barriers (open state and full fill) seals course or subsequent refresher course and can provide proof of attendance. 

Occupational relevance

Training delivered against this standard would be relevant to the following occupational group(s):

  • operative and craft.

Delegates pre-requisites

Delegates must have successfully completed Installation of linear joint and cavity barriers (open state and full fill) seals within the last 36 months. 

Instruction/supervision

As a minimum, course trainers must be able to demonstrate that, in relation to this standard, they have:

  • an award in education and training (or equivalent, as per requirements for approved training organisations)
  • successfully completed training to this standard
  • at least 2 years relevant industrial experience
  • a verifiable CV.

Delivery

Delivery may be in an on or off the job environment. 

All materials and equipment must be of a suitable quality and quantity for delegates to achieve learning outcomes and must comply with relevant legislation. 

The class size and delegate/trainer ratio must allow training to be delivered in a safe manner and enable delegates to achieve the learning outcomes.  

The following delivery methods may be used in the delivery of this standard: 

  • classroom.

This standard is considered to contain 51% or more practical training. 

This standard is considered to be set at an intermediate level.

Assessment

Methods of assessment considered appropriate for training delivered against this standard are:

For the successful completion of training, delegates must complete an end of course practical assessment or knowledge test that measures all learning outcomes and has a pass or fail criteria.

Where this training is assessed using multiple-choice questions, a minimum of 10 questions must be asked and delegates are required to achieve an overall pass mark of at least 85%.

Quality assurance

Assured

Quality assurance against this standard will require initial approval of the training organisation and their content mapped to the standard.

CITB will also conduct an approval intervention, either desk-based or centre visit, to ensure the training organisation can meet the requirements of the training standard.

Approved training organisations (ATOs) will be required to present information on records of training and assessment upon request to CITB for desk-based analysis. They will also be visited annually by the CITB quality assurance team.

Renewal

Refresher every 3 years.

Classification

Mandatory Refresher.

Keywords

Cavity Barriers, Passive Fire Stopping, Cavity Seals, Ventilated cavity barriers, Linear joint seals, Fire resistant construction joints, Construction movement and control joints, Fire rated soft joints, Fire rated head joints, Fire rated expansion joints, Open state cavity barriers.

Approval date

June 2021

Review cycle

On request or 3 years from approval date.

Learning outcomes to be refreshed

Learning outcomes to be refreshed

The delegate will be able to: 

Additional guidance to support learning outcome 

select the appropriate system to be used in all cavity and linear joint seals projects and record the installation process as part of the Golden Thread cascade of information. 

• ASFP On-site guide to installing fire-stopping 

• ASFP Advisory Note 7: Version 19-05-2014 

Horizontal Linear Gap Seals Used In Curtain Walling Systems 

BB7 video presentation Cavity Barriers in External Wall Systems 

describe the role of fire compartments and their role in the wider fire protection of the building 

 

describe what the role of the linear joint and cavity fire seal is 

 

describe the relevant legislation and guidance associated with linear joint and cavity barrier seals 

 

describe the actions that must be undertaken before installing tested cavity and linear joint seal systems: 

  • pre-installation planning 
  • pre-installation documentation 
  • pre-installation product checks. 

 

undertake and describe the process and record the installing generic fire seal systems: 

  • installing the linear joint and cavity barrier seals to manufacturers’ installation instructions into: 
  • floors 
  • walls 
  • façades. 

 

undertake on completion of the installation of cavity and linear gap seals: 

  • inspection, recording and documentation requirements 
  • site clean up 
  • post installation checks 
  • sign off and handover. 

 

undertake on completion of the installation of service penetration seals: 

  • inspection, recording and documentation requirements 
  • site clean up 
  • post installation checks 
  • sign-off and handover. 

 

Additional information about this standard 

Fire safety: Approved Document B. 

Building Regulation in England & Wales and Northern Ireland and Scotland covering fire safety matters within and around buildings. 

The ASFP publication, Ensuring Best Practice for Passive Fire Protection in Buildings,  

Regulatory Reform Order 2005.