Facebook Pixel
Skip to content

Search results

Found 43 short duration training standards. The standards are sorted in alphabetical order

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Interior Systems introduction to the construction of door and window openings

The purpose of this standard is to provide the candidate with practical knowledge and skills required to work on the construction of door and window openings.

Interior systems introduction to the maintenance and safe use of hand and power tools

The purpose of this standard is to provide the candidate with practical knowledge and skills required to maintain and safely use hand and power tools.

Interior systems introduction to the provision of service penetrations

The purpose of this standard is to provide the candidate with practical knowledge and skills required to work on the provision of service penetrations.

Interior Systems introduction to the repairs and alterations of dry lining systems

The purpose of this standard is to provide the candidate with practical knowledge and skills required to work on the repairs and alterations of dry lining systems.

Internal wall insulation

This training standard is in development and will be published shortly.

Internal wall insulation Dryliner TL

This training standard is being replaced with GET3394: Install internal wall insulation (IWI) - Direct bond and GET3395: Install internal wall insulation (IWI) - Framed Systems (metal or timber).

Internal wall insulation RF

This training standard is being replaced with GET3398: Traditional basic leadwork craft GET3394: Install internal wall insulation (IWI) - Direct bond and GET3395: Install internal wall insulation (IWI) - Framed Systems (metal or timber).

Internal Wall Insulation: DryLiner

This training standard is in development and will be published shortly.

Internal wall insulation: GypLyner IWL

This training standard is being replaced with GET3394: Install internal wall insulation (IWI) - Direct bond and GET3395: Install internal wall insulation (IWI) - Framed Systems (metal or timber).

Internal wall insulation: GypLyner Universal

This training standard is being replaced with GET3394: Install internal wall insulation (IWI) - Direct bond and GET3395: Install internal wall insulation (IWI) - Framed Systems (metal or timber).