• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Fabricate and maintain timber and proprietary formwork (FW001)
    • Erect and Strike timber and proprietary formwork (FW002)
    • Maintain timber and proprietary formwork (FW003)
    • Construct, maintain, and repair complex timber and proprietary formwork (FW004)
    • Erect and strike complex timber and proprietary formwork (FW005)
  • Experience
  • Behaviours
  • References/Glossary
Formwork

Erect and strike complex timber and proprietary formwork (FW005)

You must be able to:

Comply with the project information to erect and strike complex timber and proprietary formwork to the required specification by demonstrating work skills to:

  • plan and coordinate tasks to meet sequencing requirements working from detailed instructions and technical drawings

  • measure and mark out with high precision

  • cut and shape materials for bespoke or irregular forms

  • position and align formwork to project specification tolerances

  • secure systems using advanced fixing and bracing methods

  • safely dismantle and store reusable components

  • protect completed work and adjacent structures

Erect and strike advanced formwork components in timber and proprietary systems, working from detailed instructions and technical drawings for the following:

  • suspended landings, including those integrated into multi-level stair systems

  • unique format panels with architectural finishes, embedded features or cast in items

Next: Knowledge

You must know and understand:

How to erect and strike timber and proprietary formwork using the following:

  • interpret and apply detailed project specifications, drawings, and method statements to formwork tasks

  • understand design limits

  • erect and strike bespoke timber formwork for complex shapes, including curved, sloped, or multi-level structures

  • assemble, erect and strike proprietary formwork systems to suit non-standard geometries and site constraints

  • ensure formwork is built to required tolerances, alignment, and finish standards

  • integrate formwork with reinforcement, embedded items, and other structural components

  • apply safe and efficient methods for erecting, supporting, and striking formwork

  • follow manufacturer guidelines and technical data for proprietary systems

  • inspect timber formwork before erection and after striking to ensure structural integrity and suitability for reuse

  • identify and resolve issues affecting formwork performance, such as misalignment, leakage, or instability

  • comply with health, safety, and environmental requirements during formwork construction and maintenance

How to erect and strike timber formwork for the following components:

  • stairs including straight, multi flight and spiral configurations

  • landings including cantilevered, suspended or multi-level platforms

  • ramps ensuring correct gradient, surface finish and edge detailing

  • curved or circular structures including sloped walls or angled columns

  • pre-cast forms ensuring dimensional accuracy, surface finish, and integration of lifting or fixing inserts

How to position, secure, and remove tie systems in timber and proprietary formwork, ensuring alignment, structural integrity, and compliance with design tolerances, for the following:

  • selecting appropriate tie types for different formwork systems and concrete pressures in line with drawings and project specifications

  • interpreting drawings and specifications to determine tie spacing and placement

  • using correct locking and bracing methods to secure tie systems

  • safely removing ties without damaging concrete surfaces or reusable components

  • identifying and resolving issues such as tie failure, misalignment, or leakage

How to correctly apply protective coatings, including release agents, as part of advanced formwork operations involving complex geometries, engineered materials, and high-specification concrete finishes

The importance of recognising the limits of your own authority and consistently prioritising safety through the hierarchy of controls, preventative, collective and correct use of personal protection equipment, the use of warning signs, barriers, surroundings and secure equipment for erecting and striking timber and proprietary formwork

How to work safely with, around, and in close proximity to plant and machinery, including coordinating with plant operators and slingers signallers when lifting, placing, and striking activities with mobile and fixed equipment

The importance of teamwork, communication and leading teams or individuals in erecting and striking large system formwork

The needs of other occupations associated with erecting and striking complex timber and proprietary formwork

How the resources should be used and how any problems associated with the resources are reported in relation to:

  • timber, timber sheets and non-timber-based sheet material

  • proprietary formwork and associated items

  • tie systems, soldiers and walings

  • securing systems

  • protective coatings including release agents

  • fixtures and fittings

  • access equipment

  • hand tools, power tools and ancillary equipment

  • digital tools, tablets, BIM viewer, laser control

while adhering to environmental and sustainability regulations, and applying principles of recycling, reuse, and safe waste disposal

How to interpret complex drawings and 3D images to set out, erect and strike advanced formwork systems for the following:

  • jumpform

  • slipform

  • climbing formwork

  • protective screens

How to plan and sequence formwork erection and striking activities in coordination with reinforcement, concrete placement, and other trades

The importance of tolerance requirements and finish classifications for different structural and architectural concrete elements

How to apply advanced formwork techniques to ensure accuracy, stability, and performance, in relation to:

  • formwork detailing to accommodate grout checks and prevent leakage

  • installation and use of level control systems including screed rails, datums, laser-guided tools

  • fabrication of make-ups, including infill panels or closures to meet design tolerances and site conditions

How to correctly integrate reinforcement and embedments within formwork for the following:

  • brackets

  • cast-in bolts

  • anchor bolt

  • conduits

How the different types of waterproofing systems including integral, surface-applied, membrane-based and their implications for formwork

Why it is important to understand the implications of waterproof concrete design and practice in relation to:

  • preparing and sealing formwork to prevent leakage and maintain surface integrity

  • how to accommodate water stops, joint detailing, and embedded components in waterproof concrete pours

  • how honeycombing, cold joints, inadequate vibration can compromise waterproofing

  • the impact of waterproofing requirements on formwork design, fixing and removal

How to apply the following advanced safety systems into modern formwork for the following:

  • screens

  • catch fans

  • self-climbing safety enclosures

  • automated hydraulic lifting systems

  • load monitoring systems

  • locking and alignment indicators

The importance of the principles of load transfer, pressures from fresh concrete and not to deviate from the project specification and technical drawings

How to comply with temporary works procedures and communicate effectively with temporary works coordinators

The importance of coordinating with engineers, site managers, plant operator, slingers signallers and crane supervisors on pour sequences and crane operations

How to mentor colleagues in the use of advanced formwork systems and best practices.