• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install and relocate glass partition/internal screen systems (GP001)
    • Install fire resisting timber door assemblies and door-sets and associated hardware (GP002)
    • Install acoustic performance door assemblies and door-sets and associated hardware (GP003)
  • Experience
  • Behaviours
  • References/Glossary
Glazed Partition

Install and relocate glass partition/internal screen systems (GP001)

You must be able to:

  • Demonstrate work skills to:

    • measure

    • mark out

    • fit

    • cut

    • finish

    • position

    • secure

  • Set out framed and frameless partition systems in accordance with specifications, drawings, manufacturers’ information, and suppliers’ recommendations including:

    • doors

    • trims/mouldings

    • joint

    • intersections

    • interfaces

  • Identify the appropriate materials, tools and equipment in accordance with the specification requirements and or manufacturer specific instructions

  • Safely and correctly operate tools and equipment, plant and machinery appropriate for use

  • Install and relocate framed and frameless partition systems in accordance with specifications, drawings, manufacturers’ information, and suppliers’ recommendations including:

    • doors

    • trims/mouldings

    • joints

    • intersections

    • interfaces

  • Apply sealants in accordance with specification, designs details and manufacturers recommendations

  • Demonstrate safe handling of large-framed components and glass panes including serviceable mechanical and non-mechanical handling equipment

Next: Knowledge

You must know and understand:

  • How to identify and follow the installation quality requirements

  • How to access, read and interpret project-specific risk assessments and method statements relevant to installing framed and frameless glass partition systems

  • How to set out the works in accordance with suppliers’ recommendations and project drawings, including:

    • vertical and horizontal datums

    • setting out lines of partitions from datums

    • critical dimensions

    • openings

  • The different performances required for glazed partitions and what is required to achieve the specified acoustic and fire performance and protection

  • How to establish integrity and performance of the existing substrates

  • How to ensure the use of appropriate fixing systems and procedures

  • How to identify the location of, and work around, mechanical, and electrical services

  • How to install and demount framed and frameless partition systems in accordance with specifications, drawings, manufacturers’ information, and suppliers’ recommendations

  • How to install toughened, laminated, fire rated, and double glazed glass units

  • How to dismantle and relocate glass partition

  • How to carry out repair and maintenance in accordance with the maintenance schedule, manufacturers recommendations and regulatory requirements for maintenance

  • Glass markings, product conformity and other safety markings including labelling of 3rd party schemes

  • Failures of partition systems and consequences

  • How to install trims and mouldings, door sets, aluminium frames and ironmongery

  • The importance of recognising and determining when specialist skills and knowledge are required and report accordingly

  • The different types of sealants and their uses

  • How to work with, around and in close proximity to plant and machinery

  • How to direct and guide the operations and movement of plant and machinery

  • The tools, equipment, plant and machinery appropriate for use in each project type

  • The implications of glass on fall from height safety regulations.

  • Safe practices of handling and manoeuvring glass

  • The handling requirements for large and heavy panels

  • How to handle toughened, laminated and fire rated glass and double-glazed units with an understanding of breakage

  • The behaviour characteristics for different glass types

  • How to identify the correct PPE for the appropriate task

  • How to use serviceable mechanical and non-mechanical handling equipment for large and heavy panels

  • How fire spreads through a building and how to impede it and protect the structure in accordance with site procedures

  • The needs of other occupations associated with installing and relocating glazed partition

  • The following types of resources in relation to glazed partitions:

    • panels

    • framing sections/track

    • glass

    • doors

    • ironmongery

    • mouldings

    • trims

    • sealants

    • fitting

    • fixings

    • hand tools, power tools and equipment

Next: Install fire resisting timber door assemblies and door-sets and associated hardware (GP002)