• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence (High Friction Surfacing Hot Applied)
  • Routes to competence (High Friction Surfacing Cold Applied)
  • Routes to competence (Thermal Repair)
  • Routes to competence (Surface Defect Repair formally Crack and Joint Repair)
  • Routes to competence (Slurry Surfacing)
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Slurry Surfacing (manual) – HST001
    • High Friction Surfacing Cold Applied (manual) – HST002
    • High Friction Surfacing Hot Applied (manual) – HST003
    • Surface Defect Repair (manual) – HST004
    • Thermal Repair (manual) – HST005
  • Experience
  • Behaviours
  • References/Glossary
Highways Surface Treatments (manual)

Thermal Repair (manual) – HST005

You must be able to:

comply with the contract information to install thermal repair materials manually to the required specification by:

  • demonstrating work skills to:

    • assess area and identify repairs required

    • clean

    • mark

    • set up and position machine

    • commence and monitor the heating process

    • remove machine

    • temperature check to material specification

    • carry out penetration check

    • record temperature

    • cut into the surface to specification width

    • scarify surface

    • mix emulsion into existing surface

    • add material

    • level surface

    • brush

    • compact

    • inspect repair, measure record and communicate

    • clear site and return to operational status

  • using and maintaining hand and power tools, and equipment

Next: Knowledge

You must know and understand:

why it is important to confirm the area and location of work, the operations, safety and security requirements including temporary traffic management and immediate area protection

why it is important to establish an agreed time frame for installation

why it is important to conform to agreed specification

how and why to set out and prepare site

how and why it is important to obtain the correct temperature and heat depth

why it is important to cut into the surface to the required specification and the consequences of not doing so

how to prepare equipment to install thermal repair materials manually

how and why to protect and work around street furniture and ironwork

how and why to prepare materials, to include storing, handling, heating and mixing

how and why it is important to install materials to prepared surfaces, to include heating, pouring, laying, spreading and compacting

how any problems, including hazards and risks associated with the resources used to install thermal repair materials are controlled and reported

how and why to remove and dispose of arisings

why it is important to communicate and co-ordinate progress on installing thermal repair materials manually

how any problems with the methods of work and site conditions should be reported including those that are within your authority to rectify

how and why all machinery, hand and power tools and equipment require inspection and defect reporting

how to use all machinery, hand and power tools and equipment

how and why operative care and maintenance of all machinery, hand and power tools and equipment is carried out

the importance of engaging with others when installing thermal repair materials manually

Next: Experience