• language Language
  • Core trade competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Prepare Surfaces for Mastic Asphalt (MA001)
    • Apply Mastic Asphalt (MA002)
    • Repair and Maintain Mastic Asphalt (MA003)
    • Apply Mastic Asphalt to Special Details (MA004)
    • Carry out site measurements and evaluations (MA005)
    • Installing AVCL’s and Insulation (MA006)
  • Experience
  • Behaviours
  • References/Glossary
Mastic Asphalt

Selection of resources

You must be able to:

  • Select the correct quantity and quality of the following resources for the methods of work and materials, measuring and recording tools and equipment

Next: Knowledge

You must know and understand:

  • Why the limitations, sustainability, and defects associated with the resources are important, and how defects should be rectified

  • Why the resources have been selected and how they are used

  • How to confirm the resources and materials conform with the specified task

  • How to identify the hazards associated with the resources and methods of work, and how they are overcome

  • Methods of calculating the quantity, length, and possible wastage, associated with the method and procedure to

Next: Minimise the risk of damage