• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence (Metal Decking)
  • Routes to competence (Stud Welder)
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install Metal Decking Systems (MD001)
    • Install Studs by Stud Welding (SW001)
  • Experience
  • Behaviours
  • References/Glossary
Metal Decking and Stud Welding

Install Studs by Stud Welding (SW001)

You must be able to:

  • Comply with the contract information to install studs by stud welding efficiently to the required specification by, demonstrating work skills to:

    • set up

    • measure

    • mark

    • position

    • align

    • initiate

    • secure

    • inspect

    • test

    • clean

  • Use and maintain hand and power tools, and equipment

  • Prepare for and install studs by stud welding to working instructions

  • Complete pre-installation test in accordance with the current BS14555

  • Inspect and test installed studs and record findings in accordance with the current BS14555

Next: Knowledge

You must know and understand:

  • The importance of confirming manufacturers’ installation criteria and conforming to agreed specification

  • How to identify types and characteristics of stud welding components and to check for type, quantity, damage and report discrepancies, to include:

    • equipment

    • length and diameter of studs

    • ferrule type

  • How to identify, recognise and be competent to work in accordance with a stud welding drawing

  • How and why, it is important to measure, mark out and position studs

  • How and when cleaning is required to prepare stud positions

  • The importance of documenting the pre-installation record in accordance with current BS14555 prior to installation

  • How to inspect and test installed studs in accordance with current BS14555

  • How to position and prepare stud welding equipment including plant, cables, connections, earthing and welding gun

  • The importance of recognising the effects of applying heat to metal (distortion, heat affected zone)

  • How to set up a stud gun for installation

  • How to clean weld

  • Why it is important to recognise faults and identify the causes of faults in stud welds in accordance with current BS14555

  • The importance of maintaining dimensional accuracy

  • How to complete shut down and disassembly procedures

  • How to record, report and complete handovers of the work installed to the client

  • How the resources should be used and how any problems associated with the resources are reported in relation to:

    • studs

    • fittings and fixings

    • consumables

    • hand and power tools and equipment

    • digital equipment

  • The needs of other occupations associated with the installation of studs by stud welding

Next: Experience