• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install, remove and relocate raised access flooring systems (RAF001)
  • Experience
  • Behaviours
  • References/Glossary
Raised Access Flooring

Install, remove and relocate raised access flooring systems (RAF001)

You must be able to:

  • Accurately measure spaces to ensure placement of materials during installation

  • Mark out installation locations for raised flooring systems, mouldings, and other components

  • Securely fit and finish all installed components to ensure correct quality and specification requirements are met

  • Conduct thorough checks to ensure all installed components function as intended and meet safety regulations

  • Maintain a safe working environment by following all safety protocols and procedures

  • Use, maintain and routinely inspect hand tools, portable power tools, and equipment safely and effectively

  • Check appropriate filters and guards have been attached and used correctly

  • Check that all electrical equipment is serviceable and tested

  • Install raised access flooring systems, including fire barriers, ramps, steps, and handrails

  • Remove and relocate existing raised flooring systems including floor coverings

  • Carry out the appropriate site quality control tests

  • Demonstrate to client how to safely remove floor panels as specified in the operation and maintenance manual

Next: Knowledge

You must know and understand:

  • Review installation quality requirements and ensure work adheres to specifications

  • Interpret the information found in site inductions, roles and responsibilities, risk assessment and method statements

  • Report near misses and incidents

  • Assess the existing substrate suitability for raised access flooring installation

  • Establish and verify vertical and horizontal datum points

  • Prepare the background surface, including applying sealants, damp-course membranes, tanking, and bunding as required

  • Identify the need for and perform any necessary repairs or modifications to the existing structure and understand how to safely remove the floor panels

  • Locate and work safely around existing mechanical and electrical services

  • Identify the appropriate fixing regime based on the project specifications and substrate type

  • Accurately form openings for grilles and outlet boxes within raised access flooring panels

  • Conduct thorough checks to ensure all installed raised access flooring systems function as intended, meet safety regulations, and comply with fire safety principles

  • Carry out site quality control tests and know which ones will be appropriate.

  • Remove and reinstall raised access flooring systems with fire and plenum barriers, ramps, steps, handrails, reforming openings following manufacturer's instructions and relevant safety regulations

  • Removal and relocation of floor coverings

  • Fit floorcoverings to door wells, ramps, steps, and upstands

  • Identify the need for specialist skills or knowledge and report accordingly e.g. certified floor void fire barriers

  • Maintain a safe working environment by following all safety protocols, procedures, and working safely around plant and machinery

  • Check equipment is fitted with the necessary safety control attachments

  • Competently use and maintain a variety of hand tools, portable power tools, and equipment specific to raised access flooring installation

  • Safely operate access equipment when required for the installation process

  • Collaborate effectively with colleagues to achieve project goals

  • Follow sustainable practices, considering material selection and minimising waste during the installation process

  • Identify the correct materials and resources required to comply with the project specifications

  • Calculate material quantities, lengths, areas, and potential wastage based on installation methods

  • Resources:

    • flooring system components

    • skirting

    • perimeter strips

    • timber

    • timber-based sheet material

    • fire barriers

    • fixings

    • fittings

    • adhesives

    • sealants

    • floorcoverings

    • hand tools, portable power tools and equipment

Next: Experience