  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install First Fixing Components (WO001)
    • Install Second Fixing Components (WO002)
    • Erect structural carcassing components (WO003)
    • Maintain non-structural carpentry work (WO004)
    • Install fire resisting timber door assemblies and door-sets and associated hardware (WO005)
    • Set up and use transportable cutting and shaping machines (WO006)
  • Experience
  • Behaviours
  • References/Glossary
  • Acknowledgements
Site Carpentry - Specific to First and Second Fix Activities (Doors and Stairs)

Selection of resources

You must be able to:

  • Select the required quantity and quality of the following resources for the methods of work:

    • materials

    • components

    • fixings and accessories

    • tools and equipment

Next: Knowledge

You must know and understand:

  • Why the characteristics, quality, uses, sustainability, limitations and defects associated with the resources are important and how defects should be rectified

  • The organisational procedures to select resources, why they have been developed and how they are used

  • How to confirm the resources and materials conform with the specification

  • How the resources should be used and how any problems associated with the resources are reported

  • How to identify the hazards associated with the resources and methods of work and how they are overcome

  • Methods of calculating the quantity, area, size, volume, length and wastage associated with the method and procedure

Next: Minimise the risk of damage