• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Apply finishing plaster to surfaces (PL001)
    • Produce internal solid plasters  (PL002)
    • Apply solid render to background surfaces and produce finishes (PL003)
    • Install Plasterboard Systems (PL004)
  • Experience
  • Behaviours
  • References/Glossary
Solid Plastering

Install Plasterboard Systems (PL004)

You must be able to:

  • Carry out the pre user checks on power tools and equipment, record and report faults or defects

  • Select, use, maintain and store hand tools and equipment

  • Calculate areas, estimate quantities and select materials for plasterboard systems

  • Prepare a range of background surfaces to include solid, timber and metal for the installation of plasterboard systems including to restore and repair

  • Measure, mark out and cut plasterboard to fit area, around openings, reveals and services

  • Mix adhesive compounds to the correct ratio and in accordance with manufacturers’ instructions

  • Install plasterboard to horizontal and vertical surfaces to include timber or metal and reinforce joints using the specified mechanical fixings including to restore and repair

  • Direct bond plasterboard to solid backgrounds, including sealing around perimeter, window openings, reveals and services using the specified adhesive compounds including to restore and repair

Next: Knowledge

You must know and understand:

  • Types and characteristics of plasterboard and installation systems

  • How to carry out pre user checks on power tools and equipment, record and report faults or defects

  • How to carry out pre-installation checks to include structural integrity, vents, services (gas, electric, water, media cables)

  • How to select, use, maintain and store hand tools and equipment

  • How to calculate areas, estimate quantities and select materials for plasterboard systems

  • How to prepare a range of background surfaces to include solid, timber and metal for the installation of plasterboard systems including to restore and repair

  • How to select the specified mechanical fixings and adhesive compounds for the installation of plasterboard systems

  • How to measure, mark out and cut plasterboard to fit area, around openings, reveals and services

  • How to mix adhesive compounds to the correct ratio and in accordance with manufacturers’ instructions

  • How to install plasterboard to horizontal and vertical surfaces to include timber or metal and reinforce joints using the specified mechanical fixings including to restore and repair

  • How to direct bond plasterboard to solid backgrounds, including sealing around perimeter, window openings, reveals and services using the specified adhesive compounds including to restore and repair

Next: Experience