You must be able to:
demonstrate work skills for preparing surfaces for waterproofing including:
read and understand drawings, method statements, and material datasheets
specifications
measure
mark out
use preparation equipment to achieve the required substrate condition
use of test equipment to verify substrate conditions
prepare surfaces for the application of liquid (including resins) or sheet membranes, drained cavity, concrete, screeds or renders to given working instructions, including the following:
joints
penetrations
service entries
terminations
You must know and understand:
how to identify installation quality requirements such as read and understand and implement an inspection test plan (ITP)
how to conform to agreed specification
how to read and implement an inspection test plan
how to mark and set out areas to be prepared and repaired
how to recognise the uses, types and characteristics of waterproofing systems available for new and existing structures
how to liaise with other occupations associated with preparation of surfaces for structural waterproofing
how to liaise with other occupations associated with follow on trades/works
how to locate services such as water, gas pipes, electric cables, communications cables etc
how to protect and confirm the protection of services from damage
how to identify unsuitable conditions (moisture, temperature, contamination) and take action.
how to clean and stabilise surfaces for appropriate waterproofing product in line with manufacturers recommendations
how to prepare surfaces, including joints, service penetration points, and terminations
how to prepare surfaces appropriately for the selected waterproofing product
how to protect adjacent areas as required by the preparation method such as grit blasting, dust suppression