You must be able to:
Comply with the contract information to renew or reinstate the structure after preservation treatment to the required specification by:
Demonstrating practical work skills to:
take accurate measurements of materials and spaces
mark out clear cutting and fixing points on materials
fit components so they align with existing structure
apply membranes, sealants, adhesives, or finishes as needed
clean surfaces and work areas before and after renewal or reinstatement
position components accurately using levels and reference points
secure and fix components firmly using appropriate fixings and tools
Using, maintaining and inspecting hand and power tools and treatment equipment
Renewing or reinstating the structure after wood preservation or damp-proofing treatments relating to the following:
air bricks
masonry
structural timber elements
non-structural components such as doors, windows, skirting, architraves and services that have been temporarily moved for treatment purposes
insulation
Documenting the work as required
You must know and understand:
How to use resources including their maintenance and how to report any issues with them, including:
removed components
sand
cement
lime
bricks
masonry
stone
plasters
plasterboards
damp proof membrane (DPM)
insulation
timber
wall ties
fixings
fittings
hand and power tools and equipment
digital tools and devices
The importance of controlling the renewal or reinstatement of structures to maintain the effectiveness of the treatment
How to reinstate, replace or install sub floor air bricks
How to install passive ventilation; for example, roof lap vents or chimney breast ventilation
How to renew or reinstate masonry
Why it is important to apply the replastering system to specification where removed
How to renew or reinstate structural timber elements
How to renew or reinstate non-structural components including doors, windows, skirting, architraves
How to renew or reinstate insulation
How to mix lime, sand and cement mortars
How to clean cavities
How to clean the site after works have been finalised to ensure a safe and secure environment
How to complete post installation checks in line with specifications