• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Erect Standard Masonry Structures (BL001)
    • Set out to form standard masonry structures (BL002)
    • Erect Masonry to Form Architectural and Decorative Structures (BL003)
    • Set Out to Form Complex Masonry Structures (BL004)
  • Experience
  • Behaviours
  • References/Glossary
Bricklaying

Erect Masonry to Form Architectural and Decorative Structures (BL003)

You must be able to:

  • Set out decorative brick features (with checks) solid and cavity walls (with openings), to design specifications in a safe and consistent manner

  • Select, use, maintain and store hand tools, portable power tools and associated equipment

  • Construct solid and cavity walls and architectural and decorative features (arches, chimneys, flush projecting and decorative features, including but not limited to archways, rough ringed, axed, gauged, curved walls in elevation and on plan and walls splayed on plan, and curved walls to design specifications in a safe and consistent manner

Next: Knowledge

You must know and understand:

  • How to identify the resources, when the resources should be used, and how to report any problems with resources. Resources applicable are:

    • bricks

    • blocks

    • local materials

    • special and feature bricks

    • mortars

    • templates and arch formers

    • specialist and pre-formed lintels

    • ties

    • components

    • tools and equipment

    • digital equipment

  • The construction process for cavity and solid walling

  • A range of brick bonding

  • Materials and components required for cavity and solid walling

  • The importance of design specification, building regulations, and material selection

  • The importance of a range of communication at all levels

  • Materials and components required for installing and securing fixings and cramps

  • The construction process for installing and securing fixings and cramps

  • The construction process for all forms of cavity walls/solid walls including wall tie formation/types to design specification and drawings

  • Materials and components required for cavity and solid walling

  • The setting out process for cavity and solid walling

  • The construction process for cavity walling, maintaining brickwork gauge, plumb and cleanliness

  • How to build decorative panels including but not limited to basket weave and herringbone

  • Materials and components required for, but not limited to, forming dental courses, dog toothing, oversailing and corbelling

  • The construction process for but not limited to, forming dental courses, dog toothing, oversailing and corbelling

  • Materials and components required to use special feature bricks

  • The construction process to use special feature bricks

  • Materials and components required to form chimney stacks

  • The basic behaviour of the structure

  • The construction process to form chimney stacks

  • Materials and components required to form fireplaces

  • The construction process to form fireplaces

  • The importance of well planned, appropriate and safely sequenced construction activities

  • The setting out process for cavity and solid walling

  • The construction process for cavity and solid walling

  • Materials and components required for cavity and solid walling

  • The construction process to form walls curved on plan

  • The setting out process to form walls curved on plan

  • Materials and components required to form walls splayed on plan

  • The construction process to form walls splayed on plan

  • The setting out process to form walls splayed on plan

  • Materials and components required for forming walls curved and ramped in elevation

  • The setting out process for forming walls curved and ramped in elevation

  • The construction process for forming walls curved and ramped including bonding

  • The roles of a temporary works supervisor, temporary works co-ordinator and a temporary works engineer

  • The installation process in accordance with an approved design

  • The construction process of movement joints to design specification

  • Materials and components required for construction of movement joints

  • Materials and components required for repair and maintenance of masonry structures

  • The cutting process for masonry materials

  • The importance of health and safety including the risk of silica

  • The removal process in accordance with an approved design

  • The construction process for mortar joint finishes as per specification

  • Materials and components required for vertical and horizontal reinforcement

  • The construction process for vertical and horizontal reinforcement

  • The importance of design specification, building regulations, warranty provider standards, ensuring manufacturer installation instructions are followed and quality assurance checks are achieved

  • Knowing your own limitations and when to ask for additional guidance and training

  • Inclusion, equity and diversity in the workplace

  • The limits of your own authority as set out in the risk assessment method statement and risk assessments and site inductions

  • Materials and components required for specialist masonry elements as per the works information

  • The installation process for specialist masonry elements

  • The basic behaviour to historical buildings

  • The importance of well planned, appropriate and safely sequenced construction activities

  • The importance of site inductions and daily briefings along with regular toolbox talks

  • Recognise the relevant plant and equipment that require specialist skills, knowledge and training

  • Recognise the relevant power tools and equipment that require specialist skills, knowledge and training

  • The importance of health safety and welfare processes and the associated current guidance

  • How to use maintain and store hand tools, power tools, and equipment

  • The importance of health safety and welfare processes and the associated current guidance with working at height

  • Recognise the hierarchy of control when selecting the equipment for working at height in accordance with risk assessments, method statements

  • Selection of correct PPE in line with manufacturer datasheets

  • Recognise the different types, uses, inspection processes and limitations of access equipment/plant inline with risk assessments, method statements

Next: Set Out to Form Complex Masonry Structures (BL004)