• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Erect Standard Masonry Structures (BL001)
    • Set out to form standard masonry structures (BL002)
    • Erect Masonry to Form Architectural and Decorative Structures (BL003)
    • Set Out to Form Complex Masonry Structures (BL004)
  • Experience
  • Behaviours
  • References/Glossary
Bricklaying

Erect Standard Masonry Structures (BL001)

You must be able to:

  • Set out and build solid and cavity walls with openings, to design specifications (with checks) in a safe and consistent manner and protecting your work after each sequence

  • Select, use, maintain and store hand tools, portable power tools and associated equipment

  • Construct cavity wall, blockwork, and solid wall structures in specified materials, with openings, sills, capping's and copings, and joint finishes to design specifications (with checks) in a safe and consistent manner and protecting your work after each sequence

Next: Knowledge

You must know and understand:

  • How to identify the resources, when the resources should be used, and how to report any problems with resources. Resources applicable are:

    • bricks

    • blocks

    • local materials

    • mortars

    • frames

    • insulation

    • damp proof barriers

    • telescopic air vents

    • cloak systems

    • cills, copings and capping's

    • lintels

    • fixings and ties

    • tools and equipment

    • digital equipment

  • materials and components required for cavity and solid walling as per specification

  • A range of brick bonding and joint finishes; including wall tie spacing and types

  • The setting out process for cavity and solid walling

  • The build process for cavity and solid walling

  • A range of brick and block bonding to design specification

  • The importance of maintaining brickwork gauge, plumb and cleanliness

  • The materials and associated components required and the setting out and construction processes for a range of lintels and components in accordance with manufacturers guidelines

  • Materials and components required and the construction processes for the construction of movement joints to design specification

  • Materials and components required for specialist masonry elements such as masonry support, windposts, non-combustible damp proof course

  • The importance of well planned, appropriate and safely sequenced construction activities inclusive of approved lift plans

  • The importance of a range of communication at all levels

  • The installation process for specialist masonry elements in accordance with manufacturers guidelines

  • Materials and components required for repair and maintenance of masonry structures

  • The cutting process for masonry materials, the importance of health and safety including the risk of silica

  • The importance of design specification, building regulations, and material selection

  • The importance of health and safety including the risk of silica

  • The construction process for mortar joint finishes as per specification

  • The importance of design specification, building regulations, and material selection

  • Materials and components and the construction processes for forming openings to design specification for masonry structures

  • Materials and components required for masonry support angles and the installation process

  • The roles of a temporary works supervisor, temporary works co-ordinator and a temporary works engineer

  • The removal process in accordance with an approved design

  • Materials and associated components required for installing insulation and taping joints in guidance with manufacturers guidelines

  • The setting out process for damp proof course barriers and cloak systems and cavity trays

  • Materials and components required for damp proof barriers, cloak systems, and cavity trays

  • The construction process for damp proof courses and cavity trays to different substructure/ superstructure

  • The setting out and installing process for weep holes and weep vents

  • The materials and components required for weep holes and weep vents

  • The materials and components required for weep holes and weep vents, the setting out and installation processes in accordance building regulations or warranty provider standards

  • The construction process for installing different types of fire breaks, cavity barriers, and maintaining their integrity during the construction process in accordance with manufacturers installation guidelines

  • Recognise aspects of work that require specialist skills, competence and training

  • The construction process for all forms of cavity walls/solid walls including wall tie spacing and types to design specification and drawings

  • Materials and components required for the different types of mortar

  • Selection of correct PPE in line with manufacturer COSHH datasheets

  • How to mix mortar in line with manufacturers guidance and design information

  • How to protect works including cold weather measures

  • The importance of well planned, appropriate and safely sequenced construction activities

  • the importance of a range of communication at all levels

  • Knowing your own limitations and when to ask for additional guidance and training

  • Inclusion, equity and diversity in the workplace

  • The importance of well planned, appropriate and safely sequenced construction activities

  • The importance of design specification, building regulations, warranty provider standards, ensuring manufacturer installation instructions are followed and quality assurance checks are achieved, and recorded and kept

Next: Set out to form standard masonry structures (BL002)