• language Language
  • Core trade competencies
  • Overview
  • Sector overview
  • Routes to competence (Concrete Repair Operative)
  • Routes to competence (Sprayed Concrete)
  • Routes to competence (Composite Strengthening)
  • Routes to competence (Resin Injection)
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
    • Meet the contract specification
  • Trade specific competencies
    • Install, maintain and remove work area protection and safety equipment (CR001)
    • Use access equipment up to six metres (CR002)
    • Identify basic degradation in concrete structures (CR003)
    • Prepare substrate to repair concrete (CR004)
    • Apply materials to repair concrete (CR005)
    • Apply coatings as structure protection (CR006)
    • Apply dry sprayed concrete (CR007)
    • Install composite strengthening systems (CR008)
    • Prepare site for chemical and resin grouting (CR009)
    • Perform chemical and resin grouting (CR010)
  • Experience
  • Behaviours
  • References/Glossary
Concrete Repair Operative

Selection of resources

You must be able to:

Select the required quantity and quality of the following resources for the methods of work:

  • materials

  • components and fixings

  • tools and equipment

Next: Knowledge

You must know and understand:

Why the characteristics, quality, uses, sustainability, limitations and defects associated with the resources are important and how defects should be rectified

The organisational procedures to select resources

How to ensure the materials used comply with the specification

How to identify the hazards associated with the resources and methods of work and how they are overcome

Methods of calculating the quantities and dimensions of materials and wastage associated with the method and procedure