• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence (Concrete Repair Operative)
  • Routes to competence (Sprayed Concrete)
  • Routes to competence (Composite Strengthening)
  • Routes to competence (Resin Injection)
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
    • Meet the contract specification
  • Trade specific competencies
    • Install, maintain and remove work area protection and safety equipment (CR001)
    • Use access equipment up to six metres (CR002)
    • Identify basic degradation in concrete structures (CR003)
    • Prepare substrate to repair concrete (CR004)
    • Apply materials to repair concrete (CR005)
    • Apply coatings as structure protection (CR006)
    • Apply dry sprayed concrete (CR007)
    • Install composite strengthening systems (CR008)
    • Prepare site for chemical and resin grouting (CR009)
    • Perform chemical and resin grouting (CR010)
  • Experience
  • Behaviours
  • References/Glossary
Concrete Repair Operative

Prepare site for chemical and resin grouting (CR009)

You must be able to:

comply with the contract information to carry out the preparation of site for chemical and resin grouting to the required specification by demonstrating work skills to:

  • measure

  • check

  • set out

  • position

  • couple/uncouple

  • connect/disconnect

  • assemble/dissemble

  • drive/withdraw lances and packers

using and maintaining hand and portable tools, and associated equipment

preparing site for chemical and resin grouting and soil injection to working instructions relating to the following:

  • locating and protecting services and the work environment

  • positioning machines and equipment

  • positioning materials

  • assembling and connecting injection equipment

report and record works

undertake safety checks on hand and portable tools and associated equipment

Next: Knowledge

You must know and understand:

how the resources should be used and how any problems associated with the resources are reported in relation to:

  • injection materials

  • protection materials

  • drill and drill bits

  • packers, lances and connectors

  • additional personal protective equipment such as chemical resistant gloves and high impact protective glasses

  • grouting equipment

  • hand and power tools, equipment and accessories

how to comply with method statements and risk assessments

identify installation quality requirements

how to recognise site layouts

how to protect services and the work environment

how to drive lances to depth

how to locate and position equipment safely on site

how to confirm, locate, lay out and connect system hoses and cables to agreed water, air and power supplies

how to safely dispose of waste in accordance with the site waste management plan and COSHH assessment

how to locate and protect drains, and water courses and place drip trays for machines, materials and equipment

how and when to use a spill kit

how to recognise and determine when specific skills and knowledge are required and report or escalate accordingly

Next: Perform chemical and resin grouting (CR010)