• language Language
  • Trade Specific Competencies
  • Overview
  • Sector Overview
  • Routes to Competence
  • Functional Map
  • Core Construction Competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
    • Coordinate and organise work operations (CC007)
  • Core Trade Competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Allocated Time
  • Trade Specific Competencies
    • Assess and prepare subfloor surfaces for floorcoverings (FC001)
    • Prepare and fit underlays for floorcoverings (FC002)
    • Set out for laying floorcoverings (FC003)
    • Prepare surfaces to receive floorcoverings (FC004)
    • Assess and evaluate conditions for floorcoverings (FC005)
    • Install textile floorcoverings (FC006)
    • Install resilient floorcoverings (FC007)
    • Join and repair textile floorcoverings (FC008)
    • Install timber-based floorcoverings (FC009)
    • Set out floor areas for specified design floorcovering installations (FC010)
    • Install specified design resilient or textile floorcoverings (FC011)
    • Install specified design wood and timber-based floorcoverings (FC012)
  • Experience
  • Behaviours
  • References/Glossary
Floorcovering

Assess and evaluate conditions for floorcoverings (FC005)

You must be able to:

  • Comply with the contract information to assess and evaluate conditions for floorcoverings efficiently to the required specification by:

    • demonstrating work skills to:

      • set up test

      • read

      • record

    • using testing and recording equipment and ancillary equipment

    • carrying out tests to working instructions on the following floor surfaces:

      • cementitious surfaces

      • proprietary screeds

      • timber-based surfaces

      • existing subfloors

Next: Knowledge

You must know and understand:

  • How the resources should be used and how any problems associated with the resources are reported in relation to testing and recording equipment and instruments levels

  • Methods of calculating the quantity, length and wastage associated with the method and procedure to assess and evaluate conditions for floorcoverings

  • How to meet the contract specification in relation to the following:

    • how and why equipment is calibrated

    • how to use testing and recording equipment to assess floor suitability

    • why it is necessary to test air conditions (temperature, humidity)

    • why it is necessary to test floor conditions (dampness)

    • why it is necessary to survey site conditions

    • how to record and evaluate test results

    • how to assess findings and produce a report

    • how to determine treatment methods

    • why it is necessary to recognise and determine if underfloor heating is in-situ and respond accordingly

    • why it is important to recognise and determine when specialist skills and knowledge are required and report accordingly

    • the relevance of an assessment and its significance

    • why it is necessary to understand specific requirements for structures of special interest, traditional construction, hard-to-treat buildings and historical significance

    • how to work with, around and in close proximity to plant and machinery

    • how to work at height using access equipment

    • how to use testing and recording equipment and ancillary equipment

    • how and why operative care and maintenance of all testing and recording equipment and ancillary equipment is carried out

  • The importance of teamwork and communication

  • The importance of mental health awareness and wellbeing

  • The importance of applying Fairness, Inclusion and Respect (FIR) when dealing with others

  • The needs of other occupations associated with assessing and evaluating conditions for floorcoverings

Next: Install textile floorcoverings (FC006)