• language Language
  • Trade Specific Competencies
  • Overview
  • Sector Overview
  • Routes to Competence
  • Functional Map
  • Core Construction Competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
    • Coordinate and organise work operations (CC007)
  • Core Trade Competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Allocated Time
  • Trade Specific Competencies
    • Assess and prepare subfloor surfaces for floorcoverings (FC001)
    • Prepare and fit underlays for floorcoverings (FC002)
    • Set out for laying floorcoverings (FC003)
    • Prepare surfaces to receive floorcoverings (FC004)
    • Assess and evaluate conditions for floorcoverings (FC005)
    • Install textile floorcoverings (FC006)
    • Install resilient floorcoverings (FC007)
    • Join and repair textile floorcoverings (FC008)
    • Install timber-based floorcoverings (FC009)
    • Set out floor areas for specified design floorcovering installations (FC010)
    • Install specified design resilient or textile floorcoverings (FC011)
    • Install specified design wood and timber-based floorcoverings (FC012)
  • Experience
  • Behaviours
  • References/Glossary
Floorcovering

Assess and prepare subfloor surfaces for floorcoverings (FC001)

You must be able to:

  • Comply with the contract information to assess and prepare subfloor surfaces to receive floorcoverings efficiently to the required specification by:

    • demonstrating work skills to:

      • strip

      • assess

      • scrape

      • clean

      • measure

    • assessing and preparing subfloor surfaces to working instructions to the following:

      • removal of existing floorcoverings

      • removal of surface contaminants

      • application of repair compounds

      • application of primers

      • application of smoothing compounds or fabricated underlayments

Next: Knowledge

You must know and understand:

  • How the resources should be used and how any problems associated with the resources are reported in relation to:

    • repair compounds

    • primers

    • smoothing compounds

    • fabricated underlayments

    • moisture measuring equipment

    • moisture control systems

    • contamination removers

    • hand and power tools and ancillary equipment

    • smoothing underlays

    • sheet membranes

    • boding agents

    • adhesives

    • levelling compounds

    • cleansing agents

    • repair materials

    • mechanical fixings

  • Methods of calculating the quantity, length and wastage associated with the method and procedure to assess and prepare subfloor surfaces for floorcoverings

  • How to meet the contract specification in relation to the following:

    • How to determine the state and composition of subfloor surfaces

    • How to remove existing floorcoverings

  • How to make good surfaces prior to installation, including but not limited to using:

    • primers

    • repair compounds

    • damp proof membranes

    • moisture vapour suppressants

  • How to use moisture measuring equipment

  • Why it is important to use moisture measuring equipment

  • Why it is important to recognise and determine requirements for various floorcoverings:

    • moisture content of subfloor

    • application of moisture control systems

    • acclimatisation of materials prior to installation

    • site conditions, to include:

    • temperature

    • electricity

    • water

  • Why it is important to recognise types of subfloor contaminants and carry out methods of removal

  • Why it is necessary to recognise and determine if underfloor heating is in-situ and respond accordingly

  • Why it is important to recognise and determine when specialist skills and knowledge are required and report accordingly

  • The relevance of an assessment and its significance

  • Why it is necessary to understand specific requirements for structures of special interest, traditional construction, hard-to-treat buildings and historical significance

  • The needs of other occupations associated with preparing subfloor surfaces to receive floorcoverings

Next: Prepare and fit underlays for floorcoverings (FC002)