• language Language
  • Core trade competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Meet the contract specification
    • Allocated time
  • Trade specific competencies
    • Preparing backgrounds for tiling (WFT001)
    • Tiling wall and floor surfaces (WFT002)
    • Lay under-tile heating systems and tile surfaces (WFT003)
    • Produce complex ceramic, porcelain, mosaic, and stone surface finishes (WFT004)
    • Provide drainage for tiled surfaces (WFT005)
  • Experience
  • Behaviours
  • References/Glossary
Wall and Floor Tiling

Meet the contract specification

You must be able to:

  • Select, use, store and maintain hand and power tools, equipment and personal protective equipment

Refer to Trade Specific Competencies

Next: Knowledge

You must know and understand:

  • How to access and interpret aspects of relevant British standards and codes of practice, which apply directly to their work and substrates

  • How to identify and follow the installation requirements necessary to achieve quality standards for each specific function

  • How to determine specific requirements for structures of special interest, traditional construction, hard-to-treat buildings and historical significance

  • How to recognise and determine when specialist skills and knowledge are required and report accordingly

  • How to work with, around and in close proximity to plant and machinery

  • How to work at height using access equipment

  • How to use all hand and power tools and associated equipment

  • How and why operative care and maintenance of all hand and power tools and equipment is carried out

  • Difference in types of common preparation methods, make-up and application; screed, levelling compounds, priming and surface preparation depending on substrate

  • How to remove and replace individual damaged tiles without causing damage to adjacent finishes

  • The different handling, measuring and cutting techniques, considering how product type and size affect these processes

  • How to identify differences between modern and traditional construction methods including specific tiling techniques

  • Identify a variety of construction types and explain how they impact your work, including differences in structure, materials, and methods of installation

  • The importance of teamwork and communication

  • The importance of mental health awareness and wellbeing

  • The importance of applying fairness, inclusion and respect (fir) when dealing with others

  • The needs of other occupations associated with Wall and Floor Tiling

  • Collaborative working techniques with internal and external stakeholders

Next: Allocated time