    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
    • Develop and maintain good working relationships (CC005)
    • Confirm the occupational method of work (CC006)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Meet the contract specification
    • Allocated time
  • Trade specific competencies
    • Preparing backgrounds for tiling (WFT001)
    • Tiling wall and floor surfaces (WFT002)
    • Lay under-tile heating systems and tile surfaces (WFT003)
    • Produce complex ceramic, porcelain, mosaic, and stone surface finishes (WFT004)
    • Provide drainage for tiled surfaces (WFT005)
  • Experience
  • Behaviours
  • References/Glossary
Wall and Floor Tiling

Selection of resources

You must be able to:

  • Calculate and select the required quantity and quality of resources for the methods of work for:

    • materials

    • tools and equipment

    • components and fixings

  • Select, use, maintain, and store tiling tools and equipment

  • Advise on types and sizes of wall and floor tiles and ancillary products and the material they are manufactured from

  • Make the most efficient and effective use of resources, time and materials

  • How to undertake pre user checks on power tools and equipment, record and report faults and defects

Next: Knowledge

You must know and understand:

  • Understand the differences between product types and why the characteristics, quality, uses, sustainability, limitations and defects associated with the resources are important and how defects should be rectified

  • The organisational procedures to select resources, why they have been developed and how they are used

  • How to confirm the resources and materials conform with the specification in relation to the following:

    • different types of adhesives and grouts

    • different types of screeds/render and specialist preparations such as waterproof tanking, decoupling and anti-fracture membranes

    • different types and weight limits of wall and floor substrates

    • different types of resources, tools and equipment for preparing backgrounds and fixing wall and floor tiles

  • The most appropriate products for each application and relevant factors influencing selection in different settings the impact of drying and curing times for various backgrounds

  • Why, where and how the resources should be used and how any problems associated with the resources are reported in relation to:

    • protective sheets and masking materials

    • degreasing agents

    • fillers (single and two-pack)

    • abrasives

    • surface treatment materials

    • waste containers

    • appropriate access equipment

    • digital equipment including but not limited to laser levels and measures

    • cement and sand renders

    • plaster renders

    • screeds

    • sheets

    • boards

    • trim

    • bonding and priming agents

    • waterproofing systems

    • membranes and accessories

    • hand and power tools, and equipment

    • digital equipment

    • tiling material

    • adhesives

  • How to identify the hazards associated with the resources and methods of work and how they are overcome

  • Methods of calculating the quantity, length and wastage associated with the method and procedure to prepare surfaces for wall and floor tiling

  • That a construction product choice, substitution or recommendation cannot be made unless agreed by design team and project managers

  • Ensuring the safe handling, storage, and protection of materials, equipment, and the work area

  • Information on construction products is communicated information must be passed on accurately and without changes from that created by the relevant authority