• language Language
  • Core trade competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install Wall Insulation (EWI001)
    • Apply surface finishes to external wall insulation (EWI002)
    • Insulation and building treatments building construction, defects and interfaces (EWI003)
  • Experience
  • Behaviours
  • References/Glossary
External Wall Insulation

Selection of resources

You must be able to:

  • Select the required quantity and quality of the following resources for the methods of work:

    • check the suitability, compatibility and characteristics of the materials, components and finishes, and determine if they are moisture open or moisture

    • record and report issues or defects

    • select tools and equipment

Next: Knowledge

You must know and understand:

  • Why the characteristics, compatibility, quality, uses, sustainability, limitations and defects associated with the resources are important and how defects should be rectified

  • The organisational procedures to select resources, why they have been developed and how they are used

  • How to confirm the resources and materials conform with the specification

  • How the resources should be used and how any problems associated with the resources are reported

  • How to identify the hazards associated with the resources and methods of work and how they are overcome

  • How to calculate the quantity of materials required as per the system designer specification and wastage associated with the method and procedure for external wall insulation

Next: Minimise the risk of damage