    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install Wall Insulation (EWI001)
    • Apply surface finishes to external wall insulation (EWI002)
    • Insulation and building treatments building construction, defects and interfaces (EWI003)
  • Experience
  • Behaviours
  • References/Glossary
External Wall Insulation

Apply surface finishes to external wall insulation (EWI002)

You must be able to:

  • Measure, mark out, mix, apply and fit make good including any defects

  • Carry out external pre-installation checks, assessing, recording and reporting issues to include:

    • suitable access

    • background condition and suitability

    • identification of the product used against specification

    • fixing integrity

    • vegetation

    • rainwater goods and system penetrations

    • position of damp proof course

    • vents and ventilation

    • services (gas, electric, water, media cables and signal receiving equipment)

  • Use and maintain all work tools and equipment

  • Check or apply protection to openings, fixtures and surrounding areas against the risk of damage

  • Apply corner and surface beads, trims day breaks/joints and expansion joints

  • Apply base coats, reinforcing mesh and stress patches in accordance with the design and checking at each stage for:

    • cracking

    • dampness

  • Apply sealant tapes and strips in line with the system designer specification

  • Prepare and apply external wall insulation (EWI) surface finishes to system designer specification, method statement and the required standard for:

    • dash finishes

    • synthetic or non-synthetic renders

  • Fit weather seals and mastics in line with specification

  • Reinstatement of external furniture such as rainwater goods and systems penetrations

  • Carry out post installation checks and handover

  • Carry out post installation repairs and handover

Next: Knowledge

You must know and understand:

  • How the methods of work to meet the specification and any unintended consequences are identified, reported and actioned

  • How problems are identified, reported and actioned as per specification following safe, healthy and environmental work practices

  • How to comply with procedures and skills relating to the areas of work as per specification

  • Check the design and specification against the materials to be fitted

  • How to identify record and report issues or defects with the materials, components and finishes

  • Why it is important to carry out pre- finishes checks

  • How to carry out pre-installation checks, assessing, recording and reporting issues that may inhibit commencement to include but not limited to:

    • suitable access

    • background condition and suitability

    • identification of product used against specification

    • fixing integrity

    • vegetation

    • damp proof course

    • trim projections, cills and overhang protections such as vents, glazing, doors, floors and roofs

    • vents, ducts, flues, rainwater goods and system penetrations

    • services (gas, electric, water, media cables and signal receiving equipment)

    • protections, such as vents, glazing, doors, floors and roofs

  • How and why, it is important to check, record and report issues with construction ventilation, flues, chimneys and combustion air ventilators pre and post installation

  • Why it is important to identify and report potential thermal bridging

  • How to recognise, record and report the key issues that may inhibit commencement of the work including but not limited to:

    • condition of the background insulation

    • identification of any areas of potential water penetration

    • visibility and completeness of damp proof course

    • condition of window and door seals and reveal depths

    • cill overhangs

    • condition of roof interface and overhangs

    • rainwater goods and systems penetrations

    • protection and existence of vents and ventilation to include sub floor ventilation

    • services (gas, electric, water, media cables and signal receiving equipment)

    • flues, gas pipes, and chimneys and combustible air ventilators

    • identification of protected wildlife (nesting birds, bees, bats)

    • vegetation

  • How to identify when specialist skills and knowledge are required and report accordingly including but not limited to:

    • suitable access

    • vents, ducts, flues, rainwater goods and system

    • services (gas, electric, water, media cables and signal receiving equipment)

    • asbestos

    • surface defects

    • heritage and architectural defects

    • ecology

    • fire safety

    • penetrations

  • How and why to identify, record, report unintended consequences not addressed in the design

  • Why it is important to avoid unintended consequences not addressed in the design

  • How to protect the adjacent surfaces and work areas

  • Why it is important to explain installation procedure to building occupants to include but not limited to the following:

    • scope and work programme

    • safety requirements during the installation process

    • protection of property and personal items

    • specific benefits and implications to include homeowner information

    • agreed standards of making good

  • How not to compromise the function of but not limited to:

    • windows & doors

    • damp proof course

  • How to work with, around and in close proximity to plant and machinery

  • How to identify and follow the installation quality requirements as per specification

  • How to ensure materials are as per specification and report any inaccuracies and defects

  • How to fix corner surface beads and trims as per specification

  • How and when to apply base and primer coats, reinforcing mesh and stress patches

  • How to fit weather seals at interfaces, window and door reveals and at system penetrations in accordance with the specification, design drawings and method statements

  • How to apply dash finishes, synthetic and non-synthetic renders, paint finishes, brick slips and brick effect render to external wall insulation system including door and window reveals

  • How to reinstate fixtures and fittings and seals in accordance with the specification, design drawings and method statements

  • How to use all work tools and installation equipment

  • How to work at height using access equipment and harness systems

  • How and why maintenance of all work tools and installation equipment is carried out

  • Why and how to complete post installation checks, compliance with specifications, including penetrations, fixtures and fittings and report any issues

  • How to carry out any repairs after installation

  • Why it is important to immediately record and report unforeseen events including but not limited to materials, equipment malfunctions, situations and faults not identified in the original design

  • Why it is important to provide post installation advice and guidance to building occupants and client including homeowner packs

  • How to handover and sign off to the site manager, client or homeowner satisfaction