You must be able to:
Remove, measure, mark out, cut, line, level, drill, fit, fix, fill, finish, position and secure to carry out pre-installation checks, assessing, recording and reporting issues as per specification to include:
suitable access
vents ducts, flues and penetrations
services (gas, electric, water, media cables)
architectural features
vegetation
rainwater and soil water services
damp proof course
surface defects
trim projections, cills and overhangs
protections, such as glazing, doors, floors and roofs
Use and maintain all work tools and equipment
Cut and fix pre-formed trims and mounting blocks
Install pattresses for fixtures and fittings
Apply treatments to existing walls
Install base track and seal
You must know and understand:
How the methods of work to meet the specification and any unintended consequences are identified, reported and actioned
How problems are identified, reported and actioned as per specification following safe, healthy and environmental work practices
How to comply with procedures and skills relating to the areas of work as per specification
Check the design and specification against the materials to be fitted
How to identify record and report issues or defects with the materials and components
Why it is important to carry out pre- installation checks
How to carry out pre-installation checks, assessing, recording and reporting issues that may inhibit commencement, to include but not limited to:
suitable access
vents, ducts, flues, rainwater goods and system penetrations
services (gas, electric, water, media cables and signal receiving equipment)
architectural features
vegetation
damp proof course
surface defects
trim projections, cills and overhangs
protections, such as vents, glazing, doors, floors and roofs
Why it is important to ensure that all repairs identified as part of pre installation checks are completed prior to installation
The importance and function of pull-out tests
How to identify when specialist skills and knowledge are required and report accordingly including but not limited to:
fire safety
services (gas, electric, water, media cables and signal receiving equipment)
asbestos
vents, ducts, flues, rainwater goods and system penetrations
surface defects
suitable access
heritage and architectural features
ecology
Why it is important to identify and report potential thermal bridging
How to identify, record and report unintended consequences not addressed in the design
How and why, it is important to avoid unintended consequences not addressed in the design
The effects and restrictions of weather
How not to compromise the function of but not limited to:
windows & doors
damp proof course
How to protect the adjacent surfaces and work areas
Why and how to remove ancillary wall fixtures as necessary and to install the system in accordance with the specification, design drawings and method statements
How to prepare surfaces by removing existing defective surface finishes, repairing and using appropriate materials to make good the following, including but not limited to:
holes
loose render
belcasts
painted surfaces
remove existing vegetation and treat
How to apply surface treatments to existing walls
Why it is important to identify and report architectural features not addressed on the design
How to recognise, record and report the key issues that may inhibit commencement of boarding including but not limited to:
condition of building fabric
identification of any areas of potential water penetration
visibility of damp proof course
condition of window and door seals and reveal depths
cill overhangs
height of internal floors in relation to external floor height
condition of roof interface and overhang
damaged building fabric
soil water services
protection and existence of ventilation to include sub floor ventilation
services (gas, electric, water, media cables and signal receiving equipment)
vents, ducts, flues, rainwater goods and system penetrations
gas pipes, chimneys and combustion air ventilators
identification of protected wildlife (nesting birds, bees, bats)
vegetation
How to work with, around and in close proximity to plant and machinery
How to ensure materials are as specification and report any inaccuracies
How to identify and follow the installation quality requirements as per specification
How and why, it is important to check, record and report issues with construction ventilation, flues, chimneys and combustion air ventilators pre and post installation
How to prepare and install insulated external wall system in accordance with the system design, specification and details, method statement and the required standard
How to cut and fix pre-formed trims and mounting blocks
How to cut, line, level, drill, fix and seal tracks, beads, shims, joints, cills and flashings
How to install insulated pattresses for fixtures and fittings
How to apply weather sealing and compressive tapes at interfaces and penetrations
How to install insulation to specified fixing pattern using adhesive and or mechanical fasteners
How to apply cill detail as per specification
How to carry out any repairs after boarding installation
How to ensure fixtures are not protruding and boards rasped back flat, and gaps closed as per specification
Why and how to complete post installation checks, compliance with specifications, and report any issues
How to use all work tools and installation equipment in line with manufacturers and system specifications
How to work at height using access equipment and harness systems
How and why maintenance of all work tools and installation
The different types of air and vapour control layers and breather membranes, where and how they should be used
The importance of ensuring the integrity of air and vapour control layers and breather membranes, following installation and the need to maintain integrity
Why it is important to immediately record and report unforeseen events including but not limited to materials, equipment malfunctions, situations and faults not identified in the original design
How to handover and sign off to the site manager or client satisfaction
Why and how to complete post installation checks, compliance with specification