  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
    • Confirm work activities and resources for the work (CC004)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install Wall Insulation (EWI001)
    • Apply surface finishes to external wall insulation (EWI002)
    • Insulation and building treatments building construction, defects and interfaces (EWI003)
  • Experience
  • Behaviours
  • References/Glossary
External Wall Insulation

Install Wall Insulation (EWI001)

You must be able to:

  • Remove, measure, mark out, cut, line, level, drill, fit, fix, fill, finish, position and secure to carry out pre-installation checks, assessing, recording and reporting issues as per specification to include:

    • suitable access

    • vents ducts, flues and penetrations

    • services (gas, electric, water, media cables)

    • architectural features

    • vegetation

    • rainwater and soil water services

    • damp proof course

    • surface defects

    • trim projections, cills and overhangs

    • protections, such as glazing, doors, floors and roofs

  • Use and maintain all work tools and equipment

  • Cut and fix pre-formed trims and mounting blocks

  • Install pattresses for fixtures and fittings

  • Apply treatments to existing walls

  • Install base track and seal

Next: Knowledge

You must know and understand:

  • How the methods of work to meet the specification and any unintended consequences are identified, reported and actioned

  • How problems are identified, reported and actioned as per specification following safe, healthy and environmental work practices

  • How to comply with procedures and skills relating to the areas of work as per specification

  • Check the design and specification against the materials to be fitted

  • How to identify record and report issues or defects with the materials and components

  • Why it is important to carry out pre- installation checks

  • How to carry out pre-installation checks, assessing, recording and reporting issues that may inhibit commencement, to include but not limited to:

    • suitable access

    • vents, ducts, flues, rainwater goods and system penetrations

    • services (gas, electric, water, media cables and signal receiving equipment)

    • architectural features

    • vegetation

    • damp proof course

    • surface defects

    • trim projections, cills and overhangs

    • protections, such as vents, glazing, doors, floors and roofs

  • Why it is important to ensure that all repairs identified as part of pre installation checks are completed prior to installation

  • The importance and function of pull-out tests

  • How to identify when specialist skills and knowledge are required and report accordingly including but not limited to:

    • fire safety

    • services (gas, electric, water, media cables and signal receiving equipment)

    • asbestos

    • vents, ducts, flues, rainwater goods and system penetrations

    • surface defects

    • suitable access

    • heritage and architectural features

    • ecology

  • Why it is important to identify and report potential thermal bridging

  • How to identify, record and report unintended consequences not addressed in the design

  • How and why, it is important to avoid unintended consequences not addressed in the design

  • The effects and restrictions of weather

  • How not to compromise the function of but not limited to:

    • windows & doors

    • damp proof course

  • How to protect the adjacent surfaces and work areas

  • Why and how to remove ancillary wall fixtures as necessary and to install the system in accordance with the specification, design drawings and method statements

  • How to prepare surfaces by removing existing defective surface finishes, repairing and using appropriate materials to make good the following, including but not limited to:

    • holes

    • loose render

    • belcasts

    • painted surfaces

    • remove existing vegetation and treat

  • How to apply surface treatments to existing walls

  • Why it is important to identify and report architectural features not addressed on the design

  • How to recognise, record and report the key issues that may inhibit commencement of boarding including but not limited to:

    • condition of building fabric

    • identification of any areas of potential water penetration

    • visibility of damp proof course

    • condition of window and door seals and reveal depths

    • cill overhangs

    • height of internal floors in relation to external floor height

    • condition of roof interface and overhang

    • damaged building fabric

    • soil water services

    • protection and existence of ventilation to include sub floor ventilation

    • services (gas, electric, water, media cables and signal receiving equipment)

    • vents, ducts, flues, rainwater goods and system penetrations

    • gas pipes, chimneys and combustion air ventilators

    • identification of protected wildlife (nesting birds, bees, bats)

    • vegetation

  • How to work with, around and in close proximity to plant and machinery

  • How to ensure materials are as specification and report any inaccuracies

  • How to identify and follow the installation quality requirements as per specification

  • How and why, it is important to check, record and report issues with construction ventilation, flues, chimneys and combustion air ventilators pre and post installation

  • How to prepare and install insulated external wall system in accordance with the system design, specification and details, method statement and the required standard

  • How to cut and fix pre-formed trims and mounting blocks

  • How to cut, line, level, drill, fix and seal tracks, beads, shims, joints, cills and flashings

  • How to install insulated pattresses for fixtures and fittings

  • How to apply weather sealing and compressive tapes at interfaces and penetrations

  • How to install insulation to specified fixing pattern using adhesive and or mechanical fasteners

  • How to apply cill detail as per specification

  • How to carry out any repairs after boarding installation

  • How to ensure fixtures are not protruding and boards rasped back flat, and gaps closed as per specification

  • Why and how to complete post installation checks, compliance with specifications, and report any issues

  • How to use all work tools and installation equipment in line with manufacturers and system specifications

  • How to work at height using access equipment and harness systems

  • How and why maintenance of all work tools and installation

  • The different types of air and vapour control layers and breather membranes, where and how they should be used

  • The importance of ensuring the integrity of air and vapour control layers and breather membranes, following installation and the need to maintain integrity

  • Why it is important to immediately record and report unforeseen events including but not limited to materials, equipment malfunctions, situations and faults not identified in the original design

  • How to handover and sign off to the site manager or client satisfaction

  • Why and how to complete post installation checks, compliance with specification

Next: Apply surface finishes to external wall insulation (EWI002)