• The sector has a significant number of businesses and operatives practising the preparatory and installation works for 3 principle Insitu Floor types – resin coatings (including resin screeds and self-levelling resins), traditional screeds and flowable screeds, with companies and individuals using one, some or all of the material types.

  • Current qualification provision is through an NVQ route, supported by some Specialist Applied-skills Programmes (SAPs) but is limited in its lack of diversification in the floor type. There is a range of supplementary short duration training standards designed to support a range of flooring installations and preparatory processes.

Development process

  • A range of relevant employers, federations, manufacturers and training providers were involved in the development of this framework.

  • Individual frameworks were considered at an early stage of development, and it became apparent that industry would be better served with by a simplified approach to the qualification process to allow greater flexibility in the selection of flooring types to be assessed.

  • Research was conducted into the number of current CSCS holders, the range of qualification routes, the nature and requirements of the industry and the suitability of the existing qualification structure.

Outcomes and findings

  • The existing NVQ structure is not fit for purpose. The floor preparation elements could be modified for a more homogenous approach and to streamline the qualification process; the current resin route is dated and requires review and update; the existing screed route attempts to combine traditional and flowable screeds and has a number of gaps in skills and knowledge requirements.

  • The qualification will be better served by the existing screed pathway being split into two separate pathways, ‘Traditional Screed’ and ‘Flowable Screed’, with the delivery and assessment content being more focussed on a specific pathway.

  • The current qualification structure is complex to assess with multiple flooring options in a singular process. The pathways should be developed into such a format that would allow for a combination of pathways to be assessed simultaneously.

  • The current occupational suite (Specialist Concrete Occupations) is not a suitable location for this occupation. It should be moved to a more appropriate suite or become an independent suite.

  • CSCS nomination should change to better represent the occupation.

  • More appropriate Level 3 progression routes should be designed to allow for greater technical excellence in this occupation.