    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install, maintain and remove work area protection and safety equipment (IF001)
    • Repair, prepare and inspect substrates prior to laying floors (IF002)
    • Lay resin floors (IF003)
    • Lay traditional screed floors (IF004)
    • Lay flowable screed floors (IF005)
  • Experience
  • Behaviours
  • References/Glossary
Insitu Floor Installer

Repair, prepare and inspect substrates prior to laying floors (IF002)

You must be able to:

Comply with the contract information to repair, prepare and inspect substrates prior to laying floors efficiently to the required specification by demonstrating work skills to:

  • assess

  • measure

  • mark out

  • clean

  • break out

  • remove

  • prepare

  • form

  • chase

  • prime

  • mix

  • lay

  • compact

  • level

  • repair

  • cure

  • protect

  • inspect

Using and maintaining hand and power tools including planers and surface grinders, and equipment including dust control equipment

How to prepare and inspect the following substrates to working instructions prior to laying floors including:

  • cementitious substrates

  • calcium sulphate substrates

  • insulated areas

  • membranes

  • areas with heating systems

  • ducted areas

  • asphalt

Report work undertaken to agreed organisational procedures

Next: Knowledge

You must know and understand:

How the resources should be used and how any problems associated with the resources are reported in relation to the following:

  • primers/bonding agents, repair compounds, reinforcement and damp proof membrane (DPM)

  • screed products (types, qualities)

  • lines, levels and location marking equipment

  • joints

  • insulation

  • relevant hand and power tools, plant, machinery and ancillary equipment

  • testing equipment

  • digital equipment

How to assess condition of existing substrates

How to prepare substrates prior to laying screed including:

  • cement-based

  • calcium sulphate

  • insulated areas

  • membranes

  • asphalt

  • areas with heating systems

  • areas with ducting

  • timber

  • metal decking

How to prepare substrates, fine cementitious screed and overlays on existing surfaces prior to laying floor

How to assess residual moisture in existing substrates

How to locate and protect services (water, gas, electric and waste)

How to prepare and protect service penetrations

How to break out defective areas

How to identify and use a site datum

How to identify and apply the product minimum and maximum depths

How to work to specified surface regularity, levels, falls and gradients

How to remove laitance and dust

How to remove contamination

How to direct and guide plant and machinery

How to install, form and protect perimeter prior to repair

How to abrade surfaces by grinding, planing, scabbling and shot blasting

How to monitor and control exposure to dust

How to monitor and control exposure to vibration

How to monitor and control exposure to noise

How to consider, check and control environmental conditions

How to mix, apply, protect and cure repaired areas

How to locate and prepare for the formation of movement, expansion, induced, toe-in, transition and floor-to-wall joints

How to test surfaces for adhesion by pull off method

How to test surfaces for moisture

How to meet the agreed quality criteria

How to record and report

How to recognise and determine when specialist skills and knowledge are required and report accordingly

The needs of other occupations associated with repair, preparation and inspection of substrates prior to laying floors

How to mark out and form joints, edges, expansion, contraction and crack inducement

The limits of own skills and knowledge and the process of appropriate escalation to supervisors and managers

How to identify, select and use PPE/RPE that is specific to task

How to interpret and respond to results obtained in testing processes

Understand the sequence of installation operations

How to undertake concrete strength testing

How to undertake humidity testing

How to measure floor porosity

How to investigate for concealed utilities

Identify the extent of and potential for repair

Describe the processes to go over different floor types, including:

  • tiles

  • underfloor heating

How to remove existing surface materials and adhesives