  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Install, maintain and remove work area protection and safety equipment (IF001)
    • Repair, prepare and inspect substrates prior to laying floors (IF002)
    • Lay resin floors (IF003)
    • Lay traditional screed floors (IF004)
    • Lay flowable screed floors (IF005)
  • Experience
  • Behaviours
  • References/Glossary
Insitu Floor Installer

Lay flowable screed floors (IF005)

You must be able to:

Comply with the contract information to laying flowable screed floors efficiently to the required specification by demonstrating work skills to:

  • measure

  • mark out

  • locate

  • secure

  • form

  • fix

  • prime

  • mix

  • convey

  • lay

  • spread

  • level

  • test

  • finish

  • cure

  • protect

  • inspect

Using and maintaining relevant hand and power tools, screed pumps and associated equipment

Lay screeds to floors to working instructions using flowable screeds

Report work undertaken to agreed organisational procedures

Next: Knowledge

You must know and understand:

How the resources should be used and how any problems associated with the resources are reported in relation to the following:

  • battens, reinforcement and drainage accessories

  • movement and construction joints

  • bonding agents, additives, aggregates, colouring agents, membranes

  • flowable screeds

  • hand and power tools and ancillary equipment

  • testing equipment

  • digital equipment

How to set out and maintain level

How to locate and protect services (water, gas, electric and waste)

How to prepare and protect service penetrations

How to position and secure spacers and fixings

How to form inlets, channels and outlets

How to install perimeter edge strip, movement (expansion), thermal joints anti-crack applicable to bay sizes

How to inspect prepared substrates to include cleanliness, testing and application of primers and chemical (sheet) and mechanical damp proof membranes (DPM)

How to identify and use a site datum

How to identify and apply the product minimum and maximum depths

How to mix screeds using paddle, spiral and forced action mixer

How to convey screed material using mechanical (pumps, bulk bags by lifting equipment)

How to test screed mix for consistency

How to prepare samples for testing

How to lay and level screed to floors and around fixings to specified thickness, level and finish

How to work with, around and in close proximity to plant and machinery

How to monitor and control exposure to vibration, dust and noise

How to ensure the area is adequately ventilated during installation

How to ensure the area is adequately ventilated for drying following installation based on the screed type

How to recognise and determine when specific skills and knowledge are required and report accordingly

How to meet agreed quality criteria

The basic principles, functions and limitations of:

  • resin coatings

  • traditional screed

How to check the security of underfloor heating systems

How to install thermal insulation and acoustic resilience layers

How to ensure that the area is adequately prepared for screed installation

How to provide correct environmental conditions for screed during and following installation

The limits of own skills and knowledge and the process of appropriate escalation to supervisors and managers

How to identify, select and use PPE/RPE that is specific to task

How to interpret and respond to results obtained in testing processes

Understand the sequence of installation operations

How to protect surfaces

Identify curing times

The importance of temperature control