• language Language
  • Trade specific competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Confirm work activities and resources for the work (CC002)
    • Confirm the occupational method of work (CC003)
    • Develop and maintain good working relationships (CC004)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
  • Trade specific competencies
    • Co-ordinate and confirm the dimensional requirements of the work (OWS001)
    • Install complex suspended ceiling systems (CSC001)
    • Erect fire resisting ceiling systems (PFP001)
  • Experience
  • Behaviours
  • References/Glossary
Complex Ceilings

Erect fire resisting ceiling systems (PFP001)

You must be able to:

Demonstrating the following work skills in relation to erecting fire resistant ceiling systems:

  • measure

  • mark out

  • cut

  • position

  • fit

  • secure

  • finish

Use and maintain hand and power tools and associated equipment

Comply with the contract information to erect fire resisting ceiling systems to manufacturers’ and work instructions, and fire test details, to the required specification by setting out, erecting, or repairing fire resisting ceiling systems

Comply with the contract information to set out and install pattress, access hatches, and service openings to manufacturers’ and work instructions, and fire test details, to the required specification

Record the installation process throughout to ensure that specification and work instructions have been complied with and sufficient information is available for ongoing maintenance

Next: Knowledge

You must know and understand:

The performance functions of a fire resisting ceiling, common failure points and the implications of incorrect installation

How to identify and follow the manufacturers’ installation and quality requirements

How to ensure the integrity and suitability of the substrate

How to set out, erect, and secure fire resisting ceiling systems in accordance with manufacturers’ instructions and project drawings

How to carry out repairs or replacement of damaged fire resisting ceiling systems in accordance with manufacturers’ instructions and project drawings and why this is important

How to understand the specific system components

How to identify and report incompatible interfaces with other systems that do not have the same fire rating

How to form joints to structures and form access hatches and service openings in accordance with manufacturers’ instructions and project drawings

How to provide for ‘second fix’ items

The importance of recognising the limits of your own authority and competence

How to work with, around and in close proximity of plant and machinery

How to work at height

How to use access equipment and systems

How to use and maintain tools and equipment in accordance manufacturers’ instruction and why this is important

That a construction product choice, substitution or recommendation cannot be made and the importance of a complete system installation in accordance with manufacturers’ instructions

That if information on construction products is communicated, the information must be passed on accurately and without changes from that created by the relevant authority

The implications of incorrect installation

How the resources should be stored, used and how any problems associated with the resources are reported in relation to:

  • steel angles

  • channels

  • support systems/hangers

  • studs

  • tiles

  • framing materials

  • boards

  • panels

  • pattresses

  • hatches

  • service openings

  • insulation

  • sealant/jointing

  • fixings

  • fittings

  • hand and power tools and associated equipment

  • digital equipment

Next: Experience