• language Language
  • Core trade competencies
  • Overview
  • Sector overview
  • Routes to competence
  • Functional map
  • Core construction competencies
    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
    • Quality of Work
  • Trade specific competencies
    • Preparatory and setting out (CMA001)
    • Installation of cold formed steel panels and components (CMA002)
    • Supplementary structural components (CMA003)
    • Ancillary components integral to the light steel frame system (CMA004)
  • Experience
  • Behaviours
  • References/Glossary
Construction using offsite manufactured assemblies - Steel Frame Installer

Selection of resources

You must be able to:

  • Select the required quantity and quality of the following resources for the methods of work:

    • materials

    • components and fixings

    • tools and equipment

Next: Knowledge

You must know and understand:

  • Why the characteristics, quality, uses, sustainability, limitations and defects associated with the resources are important and how defects should be rectified

  • The organisational procedures to select resources, why they have been developed and how they are used

  • How to confirm the resources and materials conform with the specification

  • How the resources should be used and how any problems associated with the resources are reported

  • How to identify the hazards associated with the resources and methods of work and how they are overcome

  • Methods of calculating the quantity, area, size, volume, length and wastage associated with the method and procedure

  • That a construction product choice, substitution or recommendation cannot be made

  • That if information on construction products is communicated, information must be passed on accurately and without changes from that created by the relevant authority

  • The principles of material efficiency and waste minimisation in Light Steel Frame (LSF) installation: correct storage of panels/elements to prevent damage and avoid waste; segregation and disposal of steel offcuts, packaging and hazardous substances in accordance with site waste management plans; the contribution of offsite construction to reducing embodied carbon; requirements of the Future Homes Standard and their implications for LSF envelope performance

Next: Minimise the risk of damage