You must be able to:
Measure, mark out and set up grid lines and datum levels in preparation for panel and component installation, using appropriate instruments
Offload panels and components safely according to the lifting plan
Identify, check and verify panels and components against drawings and delivery schedules prior to installation, and report discrepancies
You must know and understand:
The content and purpose of construction drawings, specifications and method statements as they apply to LSF installation, including the importance of structural stability at all times
Setting-out principles including grid lines, datum levels, tolerances, and the consequences of incorrect setting out for subsequent installation stages
How to work in accordance with the lifting plan and safe off-loading procedures
How to identify, check and verify panels and components against drawings
The offsite manufacturers' production and delivery process; how to receive, check and handle pre-assembled panels and components and what to do if components are damaged, incorrect or missing and report discrepancies