    • Conform to general health, safety and welfare (CC001)
    • Conform to productive working practices (CC002)
    • Move, handle and store resources (CC003)
  • Core trade competencies
    • Interpret Information
    • Safe work practices
    • Selection of resources
    • Minimise the risk of damage
    • Approach to work
    • Quality of Work
  • Trade specific competencies
    • Preparatory and setting out (CMA001)
    • Installation of cold formed steel panels and components (CMA002)
    • Supplementary structural components (CMA003)
    • Ancillary components integral to the light steel frame system (CMA004)
  • Experience
  • Behaviours
  • References/Glossary
Construction using offsite manufactured assemblies - Steel Frame Installer

Supplementary structural components (CMA003)

You must be able to:

  • Erect complementary hot-rolled steel components: columns, beams and ring beams in accordance with drawings, specifications and manufacturers' guidance

  • Install steel frame systems wall frames, temporary cassettes and associated hot rolled steel members to form lift shafts in accordance with drawing, specifications and manufacturers' guidance

  • Position, fix and secure prefabricated stairs and handrails in accordance with drawings, specifications and manufacturers' guidance

  • Fix profiled steel decking for composite floor construction in accordance with drawings, specifications and manufacturer's guidance

  • Install disproportionate collapse components: tie bars, fire bars, anchors and reinforcement in accordance with drawings, specifications and manufacturers' guidance

  • Install mid-span propping to temporarily support decking in accordance with drawings, specifications and manufacturers' guidance (relates to concrete floors)

  • Position, secure and install balcony platforms and structures ensuring correct alignment, fixing and interface with main structure in accordance with drawings, specifications and manufacturers' guidance

  • Position, fix and adjust lift struts to support passenger or goods lift systems ensuring correct alignment in accordance with drawings, specifications and manufacturers' guidance

Next: Knowledge

You must know and understand:

  • How to erect complementary hot-rolled steel components: columns, beams and ring beams in accordance with drawings, specifications and manufacturers' guidance

  • The interfaces between cold formed steel panels, steel frame system components, and hot-rolled structural steel elements, including their fixing and connection methods, tolerance regimes, and installation sequences, in accordance with drawings, specifications, and manufacturers' guidance

  • Substrate types and suitable fixings for installing prefabricated stairs and handrails in accordance with drawings, specifications and manufacturers guidance

  • How to fix profiled steel decking for composite floor construction in accordance with drawings, specifications and manufacturer's guidance

  • The interfaces (tolerance regimes, shear stud positions, decking orientation and lap requirements) between cold formed steel panels, components and profiled steel decking used for composite floors; understand that concrete placement is outside this occupation's scope

  • The purpose and function of disproportionate collapse systems

  • The correct installation requirements for disproportionate collapse components such as tie bars, fire bars, anchors and reinforcement in accordance with drawings specifications and manufacturers' guidance and the importance of design details, fixing specifications and safety procedures to maintain structural integrity

  • The purpose, correct spacing and load bearing requirements of mid-span propping when installing temporary support for decking in accordance with drawings, specifications and manufacturers' guidance (relates to concrete floors)

  • How to position and secure balcony platforms or structures ensuring correct alignment, fixing and interface with main structure in accordance with drawings, specifications and manufacturers' guidance

  • The installation requirements for balcony platforms and structures including load paths, thermal breaks, connection details, fixings methods and sequencing in accordance with drawings, specifications and manufacturers' guidance

  • The purpose and function of lift struts, correct fixing methods, load and alignment requirements and sequencing needed to install and adjust in accordance with drawings, specifications and manufacturers' guidance