You must be able to:
Set out, cut, position and fix boarding to the required line and level in accordance with drawings, specifications and manufacturers' guidance
Install insulation, breather membranes and vapour control layers in the correct position and sequence within the LSF system
You must know and understand:
The importance of setting out, cutting, correct fixings, spacing and alignment for boarding installation in accordance with drawings, specifications and manufacturers' guidance
How to install insulation, breather membranes and vapour control layers in the correct position and sequence within the LSF system
The interfaces between cold formed steel panels, members and ancillary components including insulation, membranes, and vapour control layers, and the principles of thermal bridging, airtightness and condensation risk relevant to LSF construction
The interfaces between cold formed steel panels, members and other ancillary components: window connection details, EDPM (Ethylene Propylene Diene Monomer), roof, cladding support systems, sheathing boards, false ceilings, floating floors, and mechanical and electrical plumbing installation zones
That LSF systems are manufacturer specific and the manufacturers' installation guides and products are not interchangeable
The purpose of passive fire protection within LSF construction and types of cavity barrier and fire barrier, their locations such as party walls, floors, wall junctions, and service penetrations, there installation sequence, and the regulatory requirements