Site Search
Search module
Curator - left
Curator - center
Results that match 1 of 2 words
Forming of cavities and correct installation of ties
The purpose of training delivered against this standard is to provide candidates with the practical skill and knowledge to be able to safely and effectively construct a cavity, paying particular attention to the correct fixings of wall ties.
Plans of work and risk assessments for asbestos removal…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Working with lead alternatives
Working with lead alternatives
Personal and respiratory protective equipment for…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Built-up wall cladding construction and specification
The purpose of this standard is to provide the candidate with knowledge of managing the built-up wall package, from concept to handover.
Information sources and fixing specifications
Information sources and fixing specifications
Leak detection methods for liquid roofing
Leak detection methods for liquid roofing
Batten and membrane installation
The purpose of this standard is to provide the candidate with the knowledge and skills to install battens and membrane for a new slate and/or tile roof.
Two pack polyurethanes and flexible polyesters
Two pack polyurethanes and flexible polyesters
Car parks: products and application methods
Car parks: products and application methods