Site Search
Search module
Curator - left
Curator - center
Results that match 1 of 2 words
Industrial concrete flooring: laser screed operator
This standard covers the training needed to start operating a laser screeding machine.
Visual concrete - perception, practicalities and…
The purpose of this standard is to highlight the nuances of visual concrete specification, interpretation and achievability.
Asbestos management for duty holders
The objective of this training is to provide learners with the knowledge and understanding to carry out duty holders' role to be able to identify, assess and manage any asbestos containing materials on their premises.
Identifying blemishes, defects and deteriorating concrete …
This standard was previously known as Defects and deterioration in concrete. This training standard is designed for candidates who want to identify blemishes defects and deterioration in concrete and explore remedial options.
Temporary Works Co-ordinator Training Course (TWCTC)
This two day course is designed to assist those on site who have responsibility for managing all forms of temporary works. It is also designed to give confidence to senior management and those who engage with contractors, to reach an assessed
"CDM regulations are just as important now as they…
Today marks three years since the Construction (Design and Management) Regulations 2015 (CDM) came into place.
Reinforced concrete for engineers and supervisors
This standard aims to provide learners including engineers’ foreman, supervisors, gangers and graduates with knowledge and understanding of inspecting, pouring and testing of products relating to steel reinforcement, formwork and poured concrete.
Concrete strength assessment - cores and indirect methods …
This training standard is designed for candidates who supervise assessing hardened concrete for strength onsite primarily through core testing but with reference to other indirect non-destructive testing (NDT) methods.
Asbestos air monitoring and clearance procedures
Asbestos air monitoring and clearance procedures
Ventilation of enclosures used with asbestos removal
This standard covers knowledge and understanding needed to set up asbestos removal enclosures for in compliance with Regulation 16, Duty to prevent or reduce the spread of asbestos.
Curator - bottom
How did we do today? Give feedback