Site Search

271 - 280 of 286 search results for itc scheme rules where 9 match all words and 277 match some words.

Results that match 2 of 3 words

Repair and maintenance of traditional pre-1919 buildings…

The purpose of Repair and maintenance of traditional pre-1919 buildings - Refresher standard is for delegates who have previously passed training to the full Repair and maintenance of traditional pre-1919 buildings standard or subsequent refresher

Timber frame repair using flexible epoxy resin -…

The purpose of Timber frame repair using flexible epoxy resin – Refresher standard is for delegates who have previously passed training to the full Timber frame repair using flexible epoxy resin standard or subsequent refresher training and can

Machine control for machine operators

The purpose of this standard is to understand the principles and practices of using machine control for any aspect of groundworks and road construction. It is aimed at machine operators who are required to work with machine control equipment.

Machine control for site engineers

The purpose of this standard is to understand the principles and practices of using machine control for any aspect of groundworks and road construction.

Safety in Residential Buildings – Principal Contractor

The purpose of this standard is to provide the delegate with an understanding of the impact of legislation, regulation and industry guidance relating to the role responsibilities of the Principal Contractor under the Building Safety Act, And the