Site Search
Search module
Curator - left
Curator - center
Fully-matching results
Plain tiling introduction
Plain tiling introduction
Interlocking tiling
Interlocking tiling
Rooflights, maintenance and waterproofing
Rooflights, maintenance and waterproofing
Estimating for slating and tiling
Estimating for slating and tiling
Ventilating pitched roofing
Ventilating pitched roofing
Forming of cavities and correct installation of ties
The purpose of training delivered against this standard is to provide candidates with the practical skill and knowledge to be able to safely and effectively construct a cavity, paying particular attention to the correct fixings of wall ties.
Interlocking tiles introduction
Interlocking tiles introduction
Fixed gauge tiling
Fixed gauge tiling
Plans of work and risk assessments for asbestos removal…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing
Natural slating introduction
Natural slating introduction