Site Search

661 - 670 of 779 search results for working statistic where 19 match all words and 760 match some words.

Results that match 1 of 2 words

Repair and maintenance of traditional pre-1919 buildings…

The purpose of Repair and maintenance of traditional pre-1919 buildings - Refresher standard is for delegates who have previously passed training to the full Repair and maintenance of traditional pre-1919 buildings standard or subsequent refresher

Lean practitioner module 2: Leading Improvement Projects

The purpose of this standard is to provide the learner with the knowledge and skills to support the following: The workshop is designed to build the Lean Practitioners’ confidence in their ability to lead their project while also reassuring them

Lean practitioner module 3: Embedding Lean

The purpose of this standard is to provide the learner with the knowledge and skills to build the Lean Practitioners confidence in their ability to lead an active project through to the final stages with additional support throughout the process.

Timber frame repair using flexible epoxy resin -…

The purpose of Timber frame repair using flexible epoxy resin – Refresher standard is for delegates who have previously passed training to the full Timber frame repair using flexible epoxy resin standard or subsequent refresher training and can

Environmental awareness in construction

The purpose of this standard is to give the candidate an introduction to environmental issues in construction. This can be applied to any job role across the sectors to embed the main environmental challenges that need to be incorporated and

Internal Wall Insulation Operative

The following information for the Internal Wall Insulation Operative course outlines key details such as the modules, dates and booking contact details.