MDF Cutting Safety refresher

The purpose of training delivered against this standard is to provide candidates with an introduction to the hazards associated with cutting medium density fibreboards (MDF).

Metal Framed Wall-Lining Systems Installation

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work, installation of metal wall-linings to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g. plasterboards, fixings, sealants, components, etc.) required tools and equipment

Metal Stud Partitions - Advanced

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance including deflection heads, and more.

Metal Stud Partitions - Basic

The purpose of this standard is to provide the delegate with the knowledge to support hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance, and more.

Perimeter Climbing Access & Protection Screens for General Operatives

The purpose of this standard is to provide the delegate with the knowledge to support the following: overview, terminology, principles of climbing screens, purpose and functions of components, drawing Interpretation, installation, operation, and removal theory , practical installation, operation, and removal , hazards, risks, and interdependencies, safety features, assessment and test,

Preparing to and installing external wall insulation introduction

The purpose of this standard is to provide the delegate with the knowledge to further support their learning with the following: understanding the characteristics of resources; organisational procedures for selecting resources; identifying potential hazards with resources; protecting work and work area from damage; understanding work programmes; how to communicate with your team and others; carrying out external and internal pre and post installation checks; installing pre-finished or non-finished insulation systems; minimising thermal bridging; installing vapour control barriers; risks associated with ventilation and combustion appliances; recognising specific requirements for structures of special interest, traditional construction and historical significance; recognising when specialist skills are required; disposing of waste; looking after tools and equipment; working at height; safe use of access equipment and harness systems.

Safe digging practices (assured)

The purpose of this standard is to provide the delegate with the knowledge to support the following: interpret utility drawings plan to excavate prepare resources carry out the excavation use safe digging techniques identify the dangers and hazards associated with excavations.

Safe Excavation Techniques in Construction

The purpose of this standard is to provide the delegate with the knowledge to support the following: Scope: • spoil characteristics safe storage and removal of excavated material • maintain a safe environment • maintain tools and equipment • underground and above ground services • permits to work • working at height near excavations • safety signs and signals • emergency procedures • banksman role and responsibilities • transportation of loads • hazards – all common plant and plant machinery • hazards – collapse, noise, environmental and services • legislation, regulations and approved guidance • topsoil and subsoil characteristics • proprietary trench support • marking out and measuring • the effects of adverse weather conditions

Scaffolding Estimator

The purpose of this standard is to provide the delegate with the knowledge to support the following: Scope: identify customer requirements, various estimating formulae, site hazards plus cost implications, on-site measuring, use design drawings, measure drawings, produce quotations, contract quotation letters, day work costing, computer-based estimating and contract administration, estimating projects

Setting up for asbestos removal (1)

This standard covers the additional knowledge and skills to support trainees' development towards their Level 2 NVQ Diploma in Removal of Hazardous Waste (Licensed Asbestos).