Facebook Pixel
Skip to content

Search results

Your search for Risk resulted in 60 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Impact moling

The purpose of this standard is to provide the delegate with the knowledge to fully understand the prestart requirements of moling and trenchless technologies including an understanding of potential hazards and the avoidance of risk from other underground services.

Installation of plasterboard by direct bond (dot & dab)

The purpose of this standard is to provide the delegate with the knowledge and/or skills to support the following scope: hazards, risk assessment and safe systems of work, installation of plasterboard by direct bond to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g., plasterboards, fixings, sealants, components, adhesives etc.) required tools and equipment

Insulation calculations, condensation risk and vapour control layers

The purpose of this standard is to provide the candidate with knowledge of thermal and sound insulation for liquid-applied roofs, to: make thermal and sound insulation calculations, evaluate condensation risk, and select vapour control layers.

Introduction to drylining (tacker/boarder)

The purpose of this standard is to provide the delegate with the knowledge and/or skills to support the following: Scope: hazards, risk assessment and safe systems of work, installing plasterboard to metal frames, timber frames and by direct bond to maintain designed acoustic, thermal and fire performance, working to construction and manufacturers drawings, related products (e.g., plasterboards, fixings, sealants, components, adhesives, metal studs etc.) required tools and equipment

Large deck towers for users

This standard ensures that operatives are trained in how to safely assemble, dismantle and relocate access towers without risk of personal injury to the self or others.

Linked tower for users

This standard ensures that operatives are trained in how to safely assemble, dismantle and relocate access towers without risk of personal injury to the self or others.

Low-level towers for users

This standard ensures that operatives are trained in how to safely assemble, dismantle and relocate access towers without risk of personal injury to the self or others.

Mast climbing work platform trainer

This course instructs the trainee on all concepts to enable him/her to deliver training to MCWP operators on several MCWP types. The training’s focus will be on how to safely operate and demonstrate the use of various types of Mast Climbing Work Platforms (MCWPs), basic concepts about assembly procedures, pre-operational checks, safe emergency procedure, to understand a risk assessment and method statement, to carry out visual and functional checks and planning MCWP use.

Metal Framed Wall-Lining Systems Installation

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work, installation of metal wall-linings to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g. plasterboards, fixings, sealants, components, etc.) required tools and equipment

Metal Stud Partitions - Advanced

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance including deflection heads, and more.