Site Search
Search module
Curator - left
Curator - center
Results that match 1 of 2 words
Roof loading and manual handling
Roof loading and manual handling
Timber frame repair using flexible epoxy resin -…
The purpose of Timber frame repair using flexible epoxy resin – Refresher standard is for delegates who have previously passed training to the full Timber frame repair using flexible epoxy resin standard or subsequent refresher training and can
Batten and membrane installation
The purpose of this standard is to provide the candidate with the knowledge and skills to install battens and membrane for a new slate and/or tile roof.
Skills needs, new recruits and the challenges ahead’s…
Helping employers with their immediate skills needs, clear information to attract new recruits including from FE, and tackling long-term challenges underpin CITB’s England Plan, published today (7 April).
Introduction to GE706
Find additional guidance and resources on health and safety.
Reinforced concrete for engineers and supervisors
This standard aims to provide learners including engineers’ foreman, supervisors, gangers and graduates with knowledge and understanding of inspecting, pouring and testing of products relating to steel reinforcement, formwork and poured concrete.
Asbestos air monitoring and clearance procedures
Asbestos air monitoring and clearance procedures
Tool hire product awareness training (THPAT) - for core…
Will be able to provide the best advice and demonstration of product as to suitability to customers’ requirements for particular job to secure the hire business.
Short qualifications we pay grant for
We pay grant for the short qualifications listed below. Each qualification must be regulated but can be delivered by a number of awarding organisations. Grant payments are not linked to preference for one body over another.
Plans of work and risk assessments for asbestos removal…
The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing