Facebook Pixel
Skip to content

Search results

Your search for nec resulted in 20 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Asbestos surveying and sampling strategies

The aim of this training is to provide background and practical knowledge in the surveying of buildings for asbestos, and to provide general guidance on management procedures necessary to minimise exposure to any identified asbestos.

Behavioural safety awareness in construction

The purpose of this standard is to win the “hearts and minds” of delegates and create a compelling argument for every person to work safely, to look after themselves and their colleagues, along with the commitment and empowerment to carry out observations, report unsafe (and safe) behaviours and conditions and make appropriate interventions, where necessary.

CCDO Demolition Labourer Safety Awareness

The purpose of this standard is to cover the necessary training for the general labouring duties required as directed and supervised by a Chargehand or above.

CCDO Demolition Refurbishment Operative Safety Awareness

The purpose of this standard is to cover the necessary training for the general labouring duties required as directed and supervised by a Chargehand or above.

Flat roofing (RBM) vapour control layers

This standard covers an introduction in understanding the necessity of a bituminous vapour control layer.

NEC compensation events

The purpose of this standard is to provide learners with an opportunity to increase their understanding of compensation events, the compensation event procedures and rules for assessment of compensation events, under NEC Engineering and Construction Contracts.

NEC contract introduction

The purpose of this standard is to provide learners with an overview of the NEC Engineering and Construction Contracts.

NEC defined cost

The purpose of this standard is to provide learners with an opportunity to increase their understanding of defined cost, what is allowable as defined cost under the main options and what constitutes disallowed cost, under NEC Engineering and Construction Contracts.

NEC delays

The purpose of this standard is to provide learners with an opportunity to increase their understanding of delays and provide general guidance on delay assessment and liability for delay, under NEC Engineering and Construction Contracts.

NEC formation and administration of sub-contracts

The purpose of this standard is to provide learners with an opportunity to increase their understanding of forming and administering subcontracts under a NEC Engineering and Construction Contracts.