Facebook Pixel
Skip to content

Search results

Your search for Risk assessment resulted in 20 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Metal Framed Wall-Lining Systems Installation

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work, installation of metal wall-linings to maintain designed acoustic, thermal and fire performance. working to construction and manufacturers drawings, construction principles. related products (e.g. plasterboards, fixings, sealants, components, etc.) required tools and equipment

Metal Stud Partitions - Advanced

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance including deflection heads, and more.

Metal Stud Partitions - Basic

The purpose of this standard is to provide the delegate with the knowledge to support hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance, and more.

NHSS 12D M3 Static Works on Low Speed Dual Carriageways

Training covers: quality assurance; national Highway Sector Schemes; health & Safety; risk assessments/method statements; industry; guidance documents; chapter 8 of the traffic signs manual; types of work; safety zones; equipment and vehicles; basic layouts; maintaining closures; setting out traffic management; arrival on site; advance signs; taper installation; entering closures; removal of closures; safe taper positions; non-motorised road users; roundabouts.

NHSS 12D M5 Multi-Phase Traffic Signals

Training covers: quality assurance; national Highway Sector Schemes; health & safety requirements; risk assessments/method statements; multi-phase systems; pedestrian traffic signals; non-motorised road users;; preparation; planning; installation and Commissioning of the system; timings; site maintenance; removal.

Plans of work and risk assessment for asbestos removal operatives - refresher

The purpose of plans of work and risk assessments for asbestos removal operatives refresher standard is for delegates who have previously passed training to the full plans of work and risk assessments for asbestos removal operatives standard or subsequent refresher training and can provide proof of attendance.

Plans of work and risk assessments for asbestos removal operatives

The purpose of training delivered against this intermediate level standard is to provide candidates with the training content specified by the Health and Safety Executive (HSE) in the Control of Asbestos Regulations 2012 for operatives doing licensed work with asbestos.

Safely work at height in the reinforced concrete frame environment

This standard is designed to provide the skills and knowledge required to safely work at height in the reinforced concrete frame environment to include but not limited to proprietary and traditional formwork systems, and where precast concrete is to be used e.g. stair cores.

Shaftwall Systems

The purpose of this standard is to provide the delegate with the knowledge to support the following: hazards, risk assessment and safe systems of work; installation of metal stud partitions to maintain designed acoustic and fire performance including deflection heads, T junctions, internal and external corners, door openings, firestop plasterboard joints and service openings, and more.

Work practice and project planning for screed flooring

The purpose of this standard is to provide the delegate with the knowledge to support the following: understanding job requirements and contract information; understanding the importance of job sheets, method statements and risk assessments; legislation, industry guidance and best practice; selecting resources; handling, loading and unloading resources; health and safety risks; site organisation / set up; personal protective equipment selection; project planning