Facebook Pixel
Skip to content

Search results

Your search for setting resulted in 31 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Introduction to setting out and installation of lay in grid systems

This standard is in development and will be published shortly.

Introduction to setting out of basic metal stud partitions, wall linings and reading off plans

The purpose of this standard is to provide the candidate with practical knowledge and skills required as an introduction to setting out of basic metal stud partitions and wall linings, including reading off plans and verbal communication.

Laser scanning for construction surveying

The purpose of this standard is to provide the delegate with the knowledge to support the following: the principles and practices of laser scanning for use in construction specific contexts and covers the practical elements, relevant theory, use of software and considerations when working in a public area.

Levelling and tape measurement

This standard covers the principles of levelling and setting out by tape which can be applied to all aspects of construction including earthworks, roads, buildings, foundations, piles, structural steel, structures, reinforced concrete, and houses.

Machine control for site engineers

The purpose of this standard is to understand the principles and practices of using machine control for any aspect of groundwork's and road construction.

NHSS 12D M3 Static Works on Low Speed Dual Carriageways

Training covers: quality assurance; national Highway Sector Schemes; health & Safety; risk assessments/method statements; industry; guidance documents; chapter 8 of the traffic signs manual; types of work; safety zones; equipment and vehicles; basic layouts; maintaining closures; setting out traffic management; arrival on site; advance signs; taper installation; entering closures; removal of closures; safe taper positions; non-motorised road users; roundabouts.

Planning, setting up and managing small re-development site works

This training standard is in development and will be published shortly

Production and use of multiplate stencils (GET3436)

The purpose of this standard is to provide the learner with the knowledge and skills to support the following scope: develop skills to protect, match, scale, draw, cut out, set out, mix, pour, dilute, position, secure, apply, maintain and transfer, form, manufacture and set out complex involved, elaborate or intricate single-plate and multi-plate stencils, position and produce stencil designs

Production and use of multiplate stencils refresher (GET3437)

The purpose of this standard is to provide the learner with the knowledge and skills to support the following scope: develop skills to protect, match, scale, draw, cut out, set out, mix, pour, dilute, position, secure, apply, maintain and transfer, form, manufacture and set out complex involved, elaborate or intricate single-plate and multi-plate stencils, position and produce stencil designs

Rising damp and its control

The purpose of this standard is to provide the delegate with the knowledge and skills to support the following: identifying rising damp, using moisture meters, controlling rising damp, interpreting information, setting up equipment, stepped drilling procedures, types of damp-proof treatments, the importance of re-plastering, safe disposal of waste