Facebook Pixel
Skip to content

Search results

Your search for street works resulted in 7 matches. The standards are sorted in alphabetical order.

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

302.1 Installing, Maintaining and Removing Temporary Traffic Management on Rural and Urban Roads

This standard aims to provide employees working within the Highway Electrical Sector the underpinning knowledge required for the understanding and use of equipment for Safety at Street Works and Road Works, as appropriate to the scope of their work on site.

Excavation in the road/highway - NRSWA Unit 1, Unit 2, Unit 3

This standard covers units of competence for trained operatives in relation to the New Roads and Street Works Act 1991 (NRSWA).

Monitoring excavation in the road/highway - NRSWA Unit 1, Unit 10, Unit 11

This standard covers basic units of competence for supervisors in relation to the New Roads and Street Works Act 1991 (NRSWA).

New roads and street works act operative

The purpose of this standard is to ensure that operatives are trained to a competent level to install, renew, maintain and inspect underground apparatus in any street or road.

New roads and street works act supervisor

The purpose of this standard is to ensure that supervisors are trained to a competent level to install, renew, maintain and inspect underground apparatus in any street or road.

NRSWA - Unit 10 / S1 - Monitoring signing, lighting and guarding

This standard covers a unit of competence in relation to the New Roads and Street Works Act 1991 (NRSWA).

NRSWA - Unit 2 / O1 - Signing, lighting and guarding

This standard covers a unit of competence in relation to the New Roads and Street Works Act 1991 (NRSWA).